Laserfiche WebLink
L The aDplication fee shall e $10. All Derm—its submitted for rocs sin shall be <br />accompanied by the application fee at the time of application . This fee shall be <br />deducted from the cost of the hermit fee. <br />2. For a total construction valuation unto and including S1000. a buildinp-, hermit fee of <br />$20 shall be paid upon receipt of the permit. <br />3. For a total valuation in excess of $1000, abuilding permit fee of 120 for the first <br />$1000 valuation. plus one-half of one oer cent (0.005) of the valuation in excess of <br />$ 1000 shall be paid upon receint of the Dermit. <br />4. When the valuation of the proposed construction exceeds $1000 a nlan review fee <br />shall be paid to the Cit v at the time of application. Said plan review fee shall be <br />equal to one-half of the building permit fee. <br />5. When the valuation of the Droposed construction exceeds $1000 an inspection fee <br />shall be-t)aid. Said insDection fee shall be equal tQ one-half of the building. permit <br />fee. This inspection fee shall be in addition to anv other fee imposed by this section <br />and shall be Maid upon receipt of the hermit. <br />6. The reinspection fee shall be 110 for the first reinspection. $20 for the second <br />reinsi)ection. and $50 for eve ry reins ection thereafter. All reinspection fees shall be <br />paid prior to receiving final inspection. <br />7. Fire -related fees are established as shown below and shall be assessed as applicable. <br />Fire -related fees shall be in addition to anv other fee imposed by this section and <br />shall be paid prior to receipt of the permit. <br />Fire sprinkler plan review L7 5 <br />Fire alarm plan review $45 <br />Fixed protection systems <br />-$45 <br />Hvdrant flow test L5 0 <br />Occupational license (Fire Department walk-through inspections $10 <br />8. Miscellaneous fees shall be applied to the total taermit fee as applicable and shall be <br />in the amounts as indicated in the table below. <br />Tents/air-supported structures L25 <br />Temporary electric pole $-20 <br />Construction trailer $ 25 <br />Occupational license (Building Dept. walk-through inspection) j 10 <br />PortablesignLI 00 <br />Demolition (ner structure) L25 <br />Partial certificate of occunancv '/2 Building Permit Fee <br />Electrical Dower prior to CO (Dreppwerl $200 <br />Ordinance #97-882, Page 5 of 20 <br />