My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 02/26/2020 Minutes - Pre-Budget Planning Workshop
Laserfiche
>
City Clerk's Public Records
>
Minutes
>
City Commission Minutes
>
City Commission Minutes Archives
>
2020 City Commission Minutes
>
CC 02/26/2020 Minutes - Pre-Budget Planning Workshop
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 2:13:03 PM
Creation date
5/13/2020 1:09:38 PM
Metadata
Fields
Template:
City Clerk
Meeting Type
Workshop
City Clerk - Doc Type
Minutes
City Clerk - Date
2/26/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CASSELBERRY CITY COMMISSION <br />Minutes of February 26, 2020 — Pre-Budget Planning Workshop <br />Page 6 of 10 <br />Various bike/ped improvements (incl. new trails) <br />o Ascension Trail extension from Talisman to Lake Concord <br />Park <br />o Kewannee Trail extension <br />o N Winter Park Drive Trail <br />Construction cost vs. sales tax revenue concerns <br />SR 436 — US 17-92 to Wilshire Drive improvements <br />• County is funding design <br />Commissioner Meadows left the multi-purpose room at 1:54 p.m. <br />Commissioner Meadows returned to the multipurpose room at 1:57 p.m. <br />o Stormwater & Lakes Management — Deputy Public Works Director/City Engineer <br />Kelly Brock <br />■ Various stormwater/flood studies & improvements <br />■ Park Drive Drainage/Wetland improvements <br />■ GIS & technology enhancement <br />■ Boat launch improvements for Grassy Lake and Queens Mirror (requires <br />property acquisition) <br />■ Additional erosion control, nitrogen removal, and miscellaneous stormwater <br />projects <br />o Utilities — Public Works Director Mark Gisclar <br />■ Elimination of septic tanks through various gravity sewer extensions <br />• Crystal Bowl Circle <br />• Lance Kathryn Circle <br />• Park Drive <br />• Queens Mirror Circle <br />• Spicewood Lane <br />o Facilities — Public Works Director Mark Gisclar (with input from City Manager <br />Randy Newlon) <br />■ Public Works Department Complex (Additional funding likely needed) <br />■ Golf Course Clubhouse Replacement <br />■ Facilities Master Plan <br />■ ADA Accessibility Improvements (Multiple buildings) <br />■ More Office and Records Storage Space for City Hall <br />Mayor Glancy returned to the multi-purpose room at 1:58 p.m. <br />o Parks and Recreation — Public Works Director Mark Gisclar <br />■ Lake Concord Park Cultural Events Center and Art House Expansion <br />■ Wirz Park Water Amenities and Field Improvements <br />■ Secret Lake Park Redevelopment* <br />■ Dew Drop Park Redevelopment <br />■ Sumnytown Multi-purpose Field and Improvements <br />
The URL can be used to link to this page
Your browser does not support the video tag.