My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 04/01/2019 Minutes - Joint Workshop with PRAB
Laserfiche
>
City Clerk's Public Records
>
Minutes
>
City Commission Minutes
>
City Commission Minutes Archives
>
2019 City Commission Minutes
>
CC 04/01/2019 Minutes - Joint Workshop with PRAB
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 7:54:45 AM
Creation date
2/12/2020 7:54:41 AM
Metadata
Fields
Template:
City Clerk
Meeting Type
Workshop
City Clerk - Doc Type
Minutes
City Clerk - Date
4/1/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CASSELBGRRY CITY COMMISSION <br />Minutes of April 1, 2019 — Joint Workshop <br />Page 2 of 7 <br />2. PLEDGE OF ALLEGIANCE <br />Mayor Glancy led the Pledge of Allegiance. <br />3. ROLL CALL <br />The City Clerk called the roll of Elected Officials and Board Members. All were present. <br />4. DISCUSSION ITEMS <br />City Manager Randy Newlon stated that tonight's workshop would pick up where the March 2011, workshop <br />had left off, with presentations of the Parks Master Plans for the other three parks which are being considered <br />for funding. <br />A. Lake Concord Park/Art House Expansion <br />Presentation: Assistant Public Works Director/City Engineer Kelly Brock advised that the first park to be <br />considered tonight would be Lake Concord Park, but the focus was actually on the Art House Expansion. He <br />introduced Mr. Greg Meyer, principal with Stantec, which is the consultant assigned to the Lake Concord <br />Park/Art House Expansion project. Mr. Meyer introduced his team members, Ms. Claudia Adomavicius, one <br />of the firm's senior architects and designers, and Ms. Stephanie Hudgens, one of the firm's landscape <br />designers, who then gave a presentation which included the following components: <br />Proposed Art Gallery Conceptual Design <br />o Proposed Expansion Site Location <br />o Existing Site Photos <br />o Site Analysis Diagram <br />o Conceptual Site Plan <br />o Conceptual Floor Plan <br />o Conceptual Elevation <br />o Conceptual Rendering <br />o Architecture & Interior Reference Images <br />o Landscape Reference Images <br />Audience Participation: The following individual came forward to address this item: <br />Mr. Ed Bakalla, 560 Marigold Road, inquired whether a metal roof would be installed on <br />only the new building or on both the new and old buildings, whether the wood components <br />would be natural wood or something else, and whether there would be a family restroom at <br />the facility. Dr. Brock advised there were plans in the coming year to install a new metal <br />room on the old building and Ms. Adomavicius advised the new building would most likely <br />have a metal roof as well in order to tie in with the older building. She added that a <br />composite would be used for the wood components as natural wood would deteriorate too <br />
The URL can be used to link to this page
Your browser does not support the video tag.