My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
P & Z 06/13/2018 Minutes
Laserfiche
>
City Clerk's Public Records
>
Minutes
>
Advisory Board Minutes
>
Planning & Zoning Commission Minutes
>
P & Z Minutes Archives
>
2018 P & Z Minutes
>
P & Z 06/13/2018 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2018 6:58:19 PM
Creation date
7/24/2018 6:57:06 PM
Metadata
Fields
Template:
City Clerk
Meeting Type
Regular
City Clerk - Doc Type
Minutes
City Clerk - Date
6/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning & Zoning Commission/ <br />Local Planning Agency Minutes <br />June 13, 2018 <br />Page 2 <br />Fifth Item of Business: SPR 18.01: Axios Mixed -Use Building - 2905 Lakeview Drive. A major site plan <br />request to redevelop a property to construct a 27,266 square foot mixed used commercial/medical office <br />building located at 2905 Lakeview Drive. Parcel ID: 17.21.30-536-0000-0010. <br />Mr. Dean Fathelbab, Planner II, reviewed the information provided in his memorandum dated June 13, <br />2018, and a PowerPoint presentation to the City of Casselberry Planning and Zoning Commission (a copy of the <br />PowerPoint presentation is attached and made a part of the minutes). Addendum A was distributed to the Planning <br />and Zoning Commission (a copy is attached and made a part of the minutes). Mr. Fathelbab said that minor changes <br />were made to the site plan that effected the trip generation figure used in Attachment H of the staff report. He said <br />Addendum A reflects a net increase of 488 trips and that is below the 500 new net trip threshold required to perform <br />a traffic study. <br />Mr. Fathelbab said staff requests the Planning and Zoning Commission approve the major site plan <br />application for the Axios Mixed -Use Building (SPR 18-01) based on the site plan dated May 25, 2018, the findings of <br />fact and conclusions of the information provided in the staff report dated June 13, 2018, Addendum A and subject to <br />the following conditions and waivers: <br />Waiver Requested: <br />1. Waiver request for Section 3-14.7.G to allow a tree bank payment in the amount of $8,916.67 in lieu of <br />planting the remaining required mitigation trees. Staff supports this modification that a tree bank <br />payment in the amount of $ 8,916.67 be accepted in lieu of planting the remainder of the required <br />mitigation trees due to site constraints. <br />2. Waiver requested for Section 3-13.7.C.3.c.iii landscape requirement for parking areas, to allow one row <br />with 11 parking stalls instead of the maximum 10 parking stalls before a landscaped parking island is <br />required. Staff supports this modification due to the site constraints. <br />3. Waiver request for Section 3-15.3 to allow the required parking calculation to be based on the useable <br />square feet and not the gross square feet of the building. This would bring the total required parking <br />total down to 109 rather than 122. The applicant is proposing to provide 109 total parking spaces <br />including five (5) ADA compliant parking spaces. Staff supports this modification due to the site <br />constraints. <br />4. Waiver requested for Section 3-15(6)(A) for 100% of the regular parking stall sizes to be reduced from <br />10'x20' to 9'x18'. Staff supports a modification due to the site constraints and to make the project <br />viable. <br />Conditions of Approval: <br />1. DRC comments, from the March 22, 2018 meeting shall be addressed prior to Planning & Zoning <br />Commission review. <br />2. All utility lines shall be placed underground (Section 3-10.2 (4)). <br />3. All Public Works issues must be addressed prior to issuance of a site construction permit. <br />4. All required local, regional, state and federal permits shall be obtained before commencement of <br />development. <br />
The URL can be used to link to this page
Your browser does not support the video tag.