Laserfiche WebLink
Sec. 86-68. - System development charge and tapping fee. <br />(a) Sewer system development charge established; purpose. There is hereby <br />established a sewer charge of $6.62 per gallon, which shall be paid by the user prior to <br />hookup, or as specified by agreement, pursuant to Section 86-3, for replacing <br />equivalent unit capacity at the City's sewage treatment plant or at Iron Bridge regional <br />sewage treatment plant. Such fee shall be modified as required by the City Commission <br />to reflect costs for providing sewer capacity to a new user. The schedule set out in this <br />Section shall be used to determine the fees for providing connection to interceptor lines, <br />master lift and pumping stations, force mains, treatment facilities and other required <br />sewer facilities inside and outside the corporate limits of the City, and for retention of <br />maximum capacity and performance of the municipal sewer system. <br />(1) System development charge. The following schedule shall be used to determine <br />the sewer system development charge for customers within the City: <br />Description <br />ERU (gpd) <br />Sewer System <br />Development Charge [*] <br />Residential: <br />Single-family <br />I 200 <br />$1,324.00/unit <br />Multi -family <br />150 <br />993.00/unit <br />Commercial / <br />Non -Residential: <br />5/8' x 3/4" Meter <br />200 <br />$1,324.00/meter <br />1" Meter <br />500 <br />3,31 000/meter <br />1 1/2" Meter <br />11000 <br />6,620.00/meter <br />2" Meter <br />1,600 <br />10,592.00/meter <br />3" Meter <br />3,000 <br />19,860.00/meter <br />4" Meter <br />5,000 <br />33,100.00/meter <br />6" Meter <br />10,000 I <br />66,200.00/meter <br />8" Meter <br />16,000 <br />105,920.00/meter <br />10" Meter <br />25,000 1 <br />165,500.00/meter <br />[*] Amounts based on an adopted fee of $6.62 per gallon of capacity calculated <br />on an average daily flow basis effective January 1, 2018. <br />Notes: <br />Page 2 <br />