My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-2240 HDR Engineering, Inc - Wirz Trail Section 1 Project
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2011 Resolutions
>
11-2240 HDR Engineering, Inc - Wirz Trail Section 1 Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2013 4:49:02 PM
Creation date
8/6/2013 4:18:01 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
3/14/2011
Doc Number
11-2240
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Luis R. Cruz <br />Page 6 <br />February 24, 2011 <br />detailed accurate records of the Contractor's daily operations and of significant events <br />that affect the work. <br />The standard procedures and practices for inspection of construction projects are set <br />out in the Department's Construction Manual (CPAM). In general, the Consultant <br />shall perform in accordance with these standard procedures and practices and with <br />other accepted practices as appropriate. <br />Consultant employees responsible for reviewing Work Zone traffic control plan <br />design, implementation, inspection, and /or for supervising the selection, placement, or <br />maintenance of traffic schemes and devices in work zones shall be qualified in <br />accordance with the Department's procedure. Notwithstanding the above, the <br />Contractor is solely responsible for developing, installing and maintaining such Work <br />Zone Traffic Control. <br />8.3 Testing: <br />The Consultant shall perform sampling and testing of all component materials and <br />completed work in accordance with the Construction Contract Documents. The <br />Consultant shall advise the City Construction Engineer in a timely manner of all <br />known off -site activities and fabrication. The minimum sampling frequencies set out in <br />the Department's Materials Sampling, Testing and Reporting Guide shall be met <br />unless otherwise directed. In general the Consultant will be responsible for verification <br />testing and sampling consistent with the Contractor's approved QC Plan and the <br />Department's Materials Sampling, Testing and Reporting Guide. In complying with <br />the aforementioned guide, the Consultant shall provide daily surveillance of the <br />Contractor's Quality Control activities at the project site and perform the sampling and <br />testing of materials and completed work items that are normally done in the vicinity of <br />the project for verification and acceptance. <br />The Consultant shall be specifically responsible for job control samples determining <br />the acceptability of all materials and completed work items on the basis of either test <br />results or verification of a certification, certified mill analysis, Department label, <br />Department stamp, etc. Sampling, testing and laboratory methods shall be as required <br />by the Department's Standard Specifications or as modified by the contract provisions. <br />Documentation reports on sampling and testing shall be submitted to responsible <br />parties during the same week that the construction work is done <br />The City will monitor the effectiveness of the Consultant's testing procedures through <br />surveillance and obtaining and testing independent assurance samples. <br />The Consultant shall be responsible for transporting samples to be tested to the <br />appropriate laboratory or appropriate local City facility. <br />8.4 Engineering Services: <br />The Consultant shall perform all engineering services necessary to properly coordinate <br />the activities of all parties other than the Contractor involved in completing the project. <br />Notwithstanding the above, the Consultant is not liable to the City for failure of such <br />parties to follow written direction issued by the Consultant. <br />Services include maintaining the required level of surveillance of the Contractor <br />activities, interpreting plans, specifications, and special provisions for the Construction <br />HDR Engineering, Inc. <br />315 E Robinson Street Phone: (407) 420.4200 <br />Suite 400 Fax: (407) 420 -4242 <br />Orlando, FL 32801 -1949 www.hdrinc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.