My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-2240 HDR Engineering, Inc - Wirz Trail Section 1 Project
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2011 Resolutions
>
11-2240 HDR Engineering, Inc - Wirz Trail Section 1 Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2013 4:49:02 PM
Creation date
8/6/2013 4:18:01 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
3/14/2011
Doc Number
11-2240
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Luis R. Cruz <br />Page 2 <br />February 24, 2011 <br />Section 5.0 of this Scope of Services and with informal procedures and practices for <br />construction engineering and contract administration used by the City and Department. <br />Compliance with the applicable portions of the most current City and Department <br />manuals, procedures, and directives shall be a requirement of this agreement. <br />The Consultant will track the execution of the construction contract in order to ensure <br />that the Consultant is given timely authorization to begin work. While no personnel <br />shall be assigned until written notification by the City has been issued, the Consultant <br />shall be ready to assign personnel within two (2) weeks of notification. For the <br />duration of the project, the Consultant shall coordinate closely with the City and <br />Contractor to minimize rescheduling of Consultant activities due to construction <br />delays or changes in scheduling of Contractor activities. <br />Other projects developing within the City of Casselberry as related to FDOT <br />agreements may be added at the City's discretion. The Consultant must perform to the <br />satisfaction of the City's representatives for consideration of additional CE &I services. <br />2.0 LENGTH OF SERVICE: <br />The Consultant services for each Contract shall begin upon written notification to <br />proceed by the City. <br />The CE &I contract duration is estimated at nine (9) months. <br />3.0 DEFINITIONS: <br />City Manager: The Chief Executive Officer for the City. <br />City Engineer or Designee: The City's employee assigned to administer the <br />Construction Engineering and Inspection Program for the City. <br />City Construction Engineer: The City employee assigned to manage the Construction <br />Engineering and Inspection Contracts in a given area. <br />City Financial Director: The Administrative Head of the City Finance Department. <br />Public Information Office: The City's office assigned to manage the Public <br />Information Program. <br />Engineer of Record: The Engineer noted on the Construction plans as the responsible <br />person for the design and preparation of the plans. <br />Consultant: The Consulting firm under contract to the City for administration of <br />Construction Engineering and Inspection services. <br />Consultant Contract: The written Agreement between the City and the Consultant <br />setting forth the obligations of the parties thereto, including but not limited to the <br />performance of the work, furnishing of services, and the basis of payment. <br />Consultant Senior Project Engineer: The Engineer assigned by the Consultant to <br />manage one or more Construction Projects. This person may supervise other <br />Consultant employees and act as the lead Engineer for the Consultant. <br />Consultant Project Administrator: The individual assigned by the Consultant to <br />manage one or more Construction Projects. <br />HDR Engineering, lnc. <br />315 E Robinson Street Phone: (407) 420.420D <br />Suite 400 Fax: (407) 420 -4242 <br />Orlando, FL 32801 -1949 www.hdrine.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.