Laserfiche WebLink
Wirz Park <br />Casselberry, FL <br />Date: March 14, 2011 <br />Robert A. DeCouto <br />Musco Lighting <br />Phone: 352/243 -9999 ext. 6304 <br />888/962 -8080 toll free <br />Fax: 352/243 -2791 <br />E -mail: bob.decouto@musco.com <br />2220 Cluster Oak Or • #H <br />Clermont, FL 34711 <br />www.musco.com <br />ipment Description: Poles & Fixtures to light baseball field and basketball court <br />Light Structure GreenTM System delivered to your site in Five Easy Pieces TM <br />® (4) Pre -cast concrete bases & (4) Galvanized steel poles <br />® UL Listed remote electrical component enclosures & pole length wire harness <br />• (18) Factory -aimed and assembled luminaires <br />Also Includes: <br />® Energy savings of more than 50% over a standard lighting system <br />® 50% less spill and glare light than Musco's prior industry leading technology <br />® Musco Constant 25 TM warranty and maintenance program that eliminates 100% of your maintenance costs for <br />25 years, including labor and materials <br />® Guaranteed constant light level of 50 /30fc on baseball for 25 years, +/- 10% per IESNA RP -06 -01 <br />® Two group re -lamp at the end of the lamps' rated life, 5000 hours <br />® Control Link® Control & Monitoring System for control and management of your lighting system <br />® Lighting Contactors sized for voltage /phasing on site <br />® Structural code and wind speed = 2007 Florida Building Code with 2006 Supplement, 120 MPH. <br />Pricing listed below is based on Clay County bid #08/09 -3 <br />Field Description QTY $ Per Total <br />Baseball - 200'(50/30) <br />1 <br />$ <br />79,740 <br />$ <br />79,740 <br />Installation of 60'mh poles & Fixtures <br />4 <br />$ <br />3,290 <br />$ <br />13,160 <br />Osprey Platform <br />1 <br />$ <br />2,875 <br />$ <br />2,875 <br />Structural Engineering <br />1 <br />$ <br />1,150 <br />$ <br />1,150 <br />Removal of existing poles <br />6 <br />$ <br />4,660 <br />$ <br />27,960 <br />Wiring from contactors to poles (a. 2'/2" PVC with (4) 3/0) <br />650 <br />$ <br />34 <br />$ <br />22,100 <br />Additional Fixtures for Basketball <br />2 <br />$ <br />2,990 <br />$ <br />5,980 <br />Sub -Total <br />$ <br />152,965 <br />Deduct fordemo of wooden poles (not concrete) <br />1 <br />$ <br />(10,033) <br />$ <br />(10,033) <br />TOTAL <br />$ <br />142 932 <br />,:�� (; je 4, �� <br />Robert A DeCouto <br />Musco Representative <br />MUS <br />r r <br />