My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC Minutes 01/23/2012
Laserfiche
>
City Clerk's Public Records
>
Minutes
>
City Commission Minutes
>
City Commission Minutes Archives
>
2012 City Commission Minutes
>
CC Minutes 01/23/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 1:13:05 PM
Creation date
2/27/2012 12:30:31 PM
Metadata
Fields
Template:
City Clerk
Meeting Type
Regular
City Clerk - Doc Type
Minutes
City Clerk - Date
1/23/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CASSELBERRY CITY COMMISSION <br />Mianres of January 23, 2012 — Regular Meeting <br />Page 5 of IS <br />110- 0740 - 539.67 -84 to cover these services for this project. Funding of these services will count toward the <br />City's match requirement for the FDEP Grant. <br />Recommendation: The City Manager and the Public Works Director recommended approval of Resolution <br />11 -2337. <br />C. Resolution 12-2338— Supplement No. 39 to an Agreementwith CPH Engineers, Inc. <br />for Technical Administrative and Construction Inspection Services Pertaining to the <br />Water Quality Improvement Projects <br />"A RESOLUTION OF THE CITY OF CASSELBERRY, FLORIDA, AUTHORIZING THE <br />APPROVAL OF SUPPLEMENT NO. 39 TO THE CONTINUING CONSULTING ENGINEERING <br />SERVICES AGREEMENT WITH CPH ENGINEERS, INC. FOR CONSTRUCTION <br />ADMINISTRATIONANSPECTION SERVICES RELATING TO ADDITIONAL WATER QUALITY <br />IMPROVEMENT PROJECTS AS APPROVED BY THE FLORIDA DEPARTMENT OF <br />ENVIRONMENTAL PROTECTION; PROVIDING FOR CONFLICTS, SEVERABILITY, AND <br />EFFECTIVE DATE." <br />Introduction: Resolution 12-2338 provides for City Commission considerationof SupplementNo. 39tothe <br />Continuing Consulting Engineering Services Agreement with CPU Engineers, Inc. for Technical <br />Administrative and Construction Inspection Services Pertaining to the Water Quality Improvement Projects for <br />an amount not to exceed $216,045.60. <br />Budget Impact: Funds to cover the costs associated with Supplement No. 39 (for an amount not to exceed <br />$216,045.60, without prior authorization) are available in the FY 2012 {Pater Main Replacements Account <br />(402- 0751 - 536.63.44). The proposed finding agreement with FDEP will cover the additional technical <br />construction administration and construction engineering inspection services costs associated with this <br />supplement. Similar to the Funding Agreement with FDEP that is currently in place, the City will be <br />reimbursed on a monthly basis for the percentage of work completed. <br />Recommendation: The City Manager and the Public Works Director recommended approval of Resolution <br />12 -2338. <br />D. Resolution 12 -2339 — Change Order No. 4 to the Contractual Agreement with <br />Killebrew, Inc. for Construction of the Casselberry Water Quality Improvement <br />Projects <br />"A RESOLUTION OF THE CITY OF CASSELBERRY, FLORIDA, AUTHORIZING THE <br />EXECUTION OF CHANGE ORDER NO. 4 TO THE AGREEMENT BETWEEN THE CITY OF <br />CASSELBERRY AND KILLEBREW, INC. FOR CONSTRUCTION OF ADDITIONAL WATER <br />QUALITY IMPROVEMENT PROJECT AREAS; PROVIDING FOR CONFLICTS, <br />SEVERABILITY, AND EFFECTIVE DATE." <br />
The URL can be used to link to this page
Your browser does not support the video tag.