Laserfiche WebLink
A. distribution of the Lakes Guide at the Casselberry Senior Center, <br />B. attending a joint meeting with the Parks & Recreation Advisory Board on <br />a quarterly basis, <br />C. using the City's website to upload lakefront workshop presentations, <br />D, conduct a "state of the lakes" address annually to the City Commission, <br />and <br />E. City staff should decipher board-appropriate information and disseminate <br />accordingly. <br />Dr. Brock ensured the Board that City staff will be dedicated to distributing to the <br />LMAB any/all information directly related to projects affecting the City's lakes. <br />Workshop presentations have been uploaded to the City's website: <br />www.casselberry.org/lakes. Going forward, the, "Project Updates" section of the <br />agenda will be a permanent placeholder to discuss upcoming projects, projects <br />underway, and future projects. <br />e. Project Updates: Dr. Brock provided and discussed an extensive project list of all <br />projects to date. Board members were encouraged to utilize this topic to <br />introduce projects that Dr. Brock may have failed to mention. Projects that were <br />discussed include: Lake Concord Park, Lake Howell Baffle Boxes, Lake <br />Kathryn/Seminola Conceptual Park Plan (including proposed Mast Arm <br />Upgrades), Queens Mirror Projects, Boating Improvement Grant (Parks & <br />l Recreation), Grassy Lake Revegetation, Stormwater public education information, <br />concept of seasonal Blueway on Quintuplet Chain of Lakes, Lake Jesup BMAP <br />adoption, street sweeper purchase and graphic wrap, storm drain marking, and <br />the City's recent award published in the American City & County ®magazine. <br />Updates of each project are as follows: <br />• Lake Concord Park-project is nearing completion; a discussion of the <br />educational signage element of this project is mentioned in a separate <br />section of these minutes. See Section 4C. <br />a Lake Howell ea(fle eox- still under design; the City is considering the <br />addition of a "media" filter to each baffle box and also considering the <br />substitution of catch basin inserts instead of one of the baffle boxes, as <br />the drainage area for this particular location is insufficient to warrant a <br />baffle box. <br />® Lake Kathryn/Seminola Conceptua( Pfan- the City, in partnership with <br />Seminole County, is proposing a traffic enhancement for the <br />Seminola/Button Road intersection that should better accommodate <br />traffic (a conceptual plan was shown); there is no current funding in place <br />to begin construction of the actual Park; a meeting between the LMAB <br />and the Parks & Rec Board on this topic will be necessary, as for now, no <br />new updates. <br />i <br />e Queens Mirror Alum Treatment/Flocculation and Aeration- project <br />2 <br />