Laserfiche WebLink
<br />Planning & Zoning Commission! <br />Local Planning Agency <br />October 14. 2009 <br />Page 2 <br /> <br />Fifth Item of Business: ZB 09-09: Lakeview Center Continued. Rezoning from a designation to a <br />Mixed Use - Mid Rise (PMX-MID) zoning designation. Property located at 1501 East Altamonte Drive. <br />ADVERTISED PUBLIC HEARING - APPLICATION WITHDRAWN <br /> <br />Mr. Senzee explained that <br /> <br /> <br />withdrawn <br /> <br /> <br />Sixth Item of Business: SPR 09.05: Shoot Straiqht. Major site plan the <br />existing Shoot Straight properties at 4700 and 4750 Highway 17.92, Casselberry', Florida. <br /> <br />Mr. Charles Senzee, Planner, reviewed <br /> <br />information <br /> <br />In <br /> <br />memorandum <br /> <br /> <br />8, <br /> <br />2009, to the City of Casselberry Planning and Zoning Comrnission (a <br /> <br />is on In <br /> <br /> <br />Department). Mr. Senzee reviewed a PowerPoint presentation regarding <br /> <br />(a <br /> <br />is <br /> <br />attached and made a part of <br /> <br />minutes). Mr. <br /> <br />stated that the <br /> <br />has addressed <br /> <br />comments <br /> <br />regarding the lighting and photometries; however, that information was not <br /> <br />in their submittal. <br /> <br />stated that he spoke with the applicant prior to the meeting regarding a request to eliminate the shrub material <br /> <br />the southern and western property line due to the construction of the 6 <br /> <br />wall. <br /> <br /> <br />the <br /> <br /> <br />request recalculation of the tree bank contribution based on the elimination of the <br /> <br />Mr. <br /> <br />reviewed the <br /> <br />proposed phasing of the project <br /> <br />Mr. Senzee said should the Planning and <br /> <br />Commission <br /> <br />to <br /> <br />SPR 09-05 <br /> <br />redevelopment of three properties located at 4700-4750 US Highway 17-92 and 11 Lemon the <br /> <br /> <br />be based upon the site plan dated September 9, <br /> <br /> <br />findings of fact <br /> <br />of staff <br /> <br /> <br />October 8, 2009 and the conditions outlined in the staff report which were: <br /> <br />1. Approval of the following site plan modification requests: <br />· The amount of required parking the site may be reduced from to <br />· 37% of the required parking (13 spaces) may be reduced to a minimum of 9' x 18' in <br />2. The applicant shall provide the following corrections to the plan to submitting <br />building permits: <br />· The parking calculations shown on Sheet C-5 shall be <br />methodology utilized by staff within this report. <br />· The site lighting plan shown on SL-1 shall be amended to <br />Factor (LLF). <br />3. The project shall conform to all elements of the CRD's Urban Design Standards. The must <br />reviewed and approved by the Community Redevelopment Agency prior to issuance of <br />permits. <br />4. The "Dernolition Phasing" plan shall be revised to eliminate any <br />(CO) or a Temporary Certificate of Occupancy (TCO). The new 1 <br /> <br /> <br />or <br /> <br />to reflect <br /> <br />alternative <br /> <br />the use of <br /> <br /> <br /> <br />to a of <br />square foot building may not <br /> <br />