Laserfiche WebLink
<br /> <br />Redevelopment <br /> <br /> <br /> <br /> <br />.. <br /> <br />in <br />recovery <br />a site that achieves your <br />a site that can be <br /> <br />process <br /> <br />.. <br /> <br />.. <br /> <br />.. <br /> <br />- Stormwater <br />.. installation <br />stormwater systems installation <br /> <br />- Roads, spaces, <br /> <br />.. <br /> <br />to both <br /> <br /> <br /> <br />.. <br /> <br />.. <br /> <br />and stormwater <br /> <br />- A.,<;sume role of traditional land deveioper <br />Sub-divide the site and market it to developers <br />and retailers <br />- Incur additional costs, increase marketability of <br />the site <br />.. Benefits to <br />- Reduce the time and cost of design <br />Reduce the capital requirements <br />- Increase the number of potential developers <br /> <br />.. Installation of storm water <br />.. Installation of roads and <br />.. of or <br />.. Sale or of sites and <br /> <br /> <br /> <br /> <br /> <br />& <br />Construction <br />" Infrastructure <br /> <br />$1,290,000 <br /> <br /> <br /> <br />& <br /> <br />.. <br /> <br />Pedestrian Amenities <br /> <br />Total Est. Cost <br /> <br />$6,552,000 <br /> <br />1 <br /> <br /> <br />4 <br />