My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-1926 Change Order No. 1 to Lake Concord Stomrwater Park
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2008 Resolutions
>
08-1926 Change Order No. 1 to Lake Concord Stomrwater Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2008 1:07:02 PM
Creation date
10/1/2008 1:06:20 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
9/22/2008
Doc Number
08-1926
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CDM <br /> <br />Scope of Work <br /> <br />Construction Cost for the 100% completion milestones included in the original scope <br />of services (dated September 24, 2007). There are no additional costs associated with <br />this final opinion of the probable construction cost estimate. <br /> <br />Task 8 - Additional RAI Response (Optional) <br /> <br />If requested by the CITY and required by the SJRWMD, the ENGINEER will respond <br />to a second RAI to clarify information in the RAI response submitted as part of the <br />original scope of services (the ENGINEER had only budgeted to respond to one RAI <br />in the original scope of services (dated September 24, 2007)). <br /> <br />III. Schedules and Time Constraints <br /> <br />The total time for completing ENGINEER's design services (Tasks 1 through 7) <br />required under this authorization is three months from the date of the Notice to <br />Proceed. Should permitting become more complicated than anticipated, additional <br />time may be required to satisfy all permitting requirements. <br /> <br />IV. Deliverables <br /> <br />Services provided will be delivered both hard copy and on a compact disk (CD) <br />containing all electronic files including drawing files, minutes, graphics, <br />correspondence, etc., for this project. Design will be done using AutoCAD. <br /> <br />Revised (100%) Bid Documents _ <br /> <br />. <br /> <br />Four copies of the Engineer's Opinion of Probable Construction Cost, <br /> <br />. <br /> <br />Four sets of full size drawings (34" x 22") bound incorporating mutually agreed <br />upon comments from the 100% review meeting, <br /> <br />. <br /> <br />One loose set of drawings for reprod uction, <br /> <br />. <br /> <br />Four sets of specifications incorporating mutually agreed upon comments from <br />the 100% review meeting, <br /> <br />. <br /> <br />One set of loose specifications for reproduction, and <br /> <br />. <br /> <br />One CD with AutoCAD drawings (2007 format) of the bid drawings, and an <br />electronic copy (PDF format) of the drawings, specifications, and Opinion of <br />Probable Construction Cost. <br /> <br />V. Compensation <br /> <br />Payment will be in accordance with the CITY's Engineering Services Agreement. <br />Total Compensation for services, materials, supplies, and any other items or <br />requirements necessary to complete the work, will be on a Lump Sum basis. The <br />ENGINEER shall perform the services defined in this authorization for $72,176 as set <br />forth in Table 1. <br /> <br />S:\OOOOlBWMNBICa9selberrylScope and BudgellSccPfl_08Sep08doex <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.