Laserfiche WebLink
<br />CDM <br /> <br />SCOPE OF SERVICES <br />FOR THE CITY OF CASSELBERRY <br />LAKECONCORDSTORNnNATERPARK <br />CHANGE ORDER No.1 <br />SEPTEMBER, 2008 <br /> <br />I. Background <br /> <br />In October, 2007 Camp Dresser & McKee Inc. (ENGINEER) was retained by the City <br />of Casselberry Public Works Department (CITY) to provide consulting services for the <br />design of the Lake Concord Stormwater Park. The project provided for the design <br />and permitting of traditional park and recreational facilities as well as storm water <br />retrofitting of the project site. Major components included a boardwalk along the <br />southern and western perimeter of the lake up to Plumosa A venue, a parking lot, a <br />playground, an interactive water feature, walkways and stormwater facilities to <br />improve the quality of stormwater runoff to Lake Concord. The design also included <br />site work and the design of the foundation and concrete pad for the stage of the future <br />amphitheater. The park is located immediately north of the City of Casselberry City <br />Hall on the south shore of Lake Concord as shown in Figure 1. Based on the 90 <br />percent design drawing review comments (dated August 12, 2008), the CITY has <br />requested additional design services as well as an additional opportunity to review <br />and comment on the 100 percent design drawings. Several of the tasks specified in <br />this scope of services also constitute re-design of certain features. <br /> <br />II. Scope of Services <br />Task 1 - General Site Design <br />Subtask 1.1 - Water Spigots <br />The ENGINEER will incorporate water spigots and associated piping into the design <br />throughout the park as requested by the CITY. Water spigots will be placed near each <br />water fountain, by the stage left area, and to the west, south, northeast and southeast <br />areas to allow for pressure washing of sidewalks. Spigots will be designed so that <br />they are flush to the ground with a "Rhino" type box with lid. Priority will be given to <br />actual in-ground spigots instead of quick couplers for which the CITY will provide a <br />product reference <br /> <br />Subtask 1.2 - Dumpster Area Placement <br />The ENGINEER will design a new dumpster area as requested by the CITY. The area <br />will be located adjacent and north to the two existing parking spaces next to City Hall <br />on Municipal Way. The design for this area will consist of a 10'x10' (outside <br />perimeter), screened (masonry wall) structure with an opaque gate facing Municipal <br />Way. The ENGINEER will take care to design the area so that at least two small (9' x <br />18' usable area, angled) parking spaces will remain. <br /> <br />S,IOOOOIBWMNBICasselberrylScopeandBudge1\SCOPlUltlSllp06dOCJl <br />