My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-1943 CPH Engineers Supplement No. 25 Emergency Design & Inspection Services North Lake Triplet/Secret Lake Park Chanel Project
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2008 Resolutions
>
08-1943 CPH Engineers Supplement No. 25 Emergency Design & Inspection Services North Lake Triplet/Secret Lake Park Chanel Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2008 7:14:09 PM
Creation date
9/24/2008 7:13:18 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
9/22/2008
Doc Number
08-1943
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4. SJRWMD Permit <br /> <br />This is an emergency maintenance of the banks of the canal due to erosion and <br />storm activity of the summer of 2008. <br /> <br />a. We will attend a preliminary meeting with the City of Casselberry. This <br />meeting will be used to explain and justify the project to SJRWMD for the <br />issuance of an expedited construction permit. <br /> <br />b. We will assist in the preparation of permit application forms and back-up data <br />in an effort to obtain approval of the project by SJRWMD. The permit <br />application fee shall be paid by the applicant directly to SJRWMD. <br /> <br />5. Construction Administration <br /> <br />Inspections and day to day coordination of the project shall be performed by the <br />City. This assumes concurrent construction at the Queens Mirror site and that both <br />projects can be inspected simultaneously. <br /> <br />a. CPH will attend a pre-construction meeting organized by the City. <br /> <br />b. CPH will provide one hour of inspector time per construction day of <br />inspection oversight services to supplement the activities of the City of <br />Casselberry. We anticipate performing this work in conjunction with the <br />simultaneous construction of the other sheet piling project. Length of <br />construction is estimated as 21 calendar days (15 working days). We will . <br />provide 15 hours for this project of inspector time under this proposal. <br /> <br />b. CPH, along with the attendance of representatives of the City, shall perform <br />a substantial completion inspection and develop a punch list. <br /> <br />c. The City shall perform the final completion inspection and verify that the <br />punch list items have been completed. The City shall provide written <br />verification to CPH that the items have been completed to their satisfaction. <br /> <br />d. Based on the inspections described above, CPH will prepare the Certificate <br />of Completion for SJRWMD. <br /> <br />A manpower estimate with associated costs is attached as Exhibit 2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.