My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-1943 CPH Engineers Supplement No. 25 Emergency Design & Inspection Services North Lake Triplet/Secret Lake Park Chanel Project
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2008 Resolutions
>
08-1943 CPH Engineers Supplement No. 25 Emergency Design & Inspection Services North Lake Triplet/Secret Lake Park Chanel Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2008 7:14:09 PM
Creation date
9/24/2008 7:13:18 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
9/22/2008
Doc Number
08-1943
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT 1 <br /> <br />Scope of Services: <br /> <br />1. Plans and Specifications <br /> <br />This is an emergency repair of erosion along the southwestern bank of the canal <br />adjacent to the paved trail (Ivey Road) in Secret Lake Park. The canal runs from <br />North Lake Triplett to Lake Kathryn. <br /> <br />a. We will use the standard front end contract documents of the City for the <br />specifications and the contract provisions. We will work with staff to generate <br />the specification documents by "filling" in the necessary blanks of these <br />documents. <br />b. The technical specifications will be contained on the plans. <br />c. We will develop a cover sheet. <br />d. We will develop a general notes sheet specifically for the project. <br />e. We will develop/design a site plan for the project. <br />f. We will develop design details required for the project. <br /> <br />2. Topographic Survey <br /> <br />Perform a Topographic Survey of 600:!: linear feet of the canal that connects North <br />Lake Triplet and Lake Kathryn. The limits of the survey will be from the beginning of <br />the canal near the northwest corner of Lake Triplet and run 600:t linear feet <br />northwesterly. The survey will be performed per Chapter 61G17-6 of the Florida <br />Administrative Code in compliance with the minimum technical standards of <br />surveying and mapping of the State of Florida. <br /> <br />a. Provide topographic information within the limits of the project area at 100 <br />foot cross sections including top of bank, toe of slope, bottom elevations and <br />edge of water. <br />b. Provide topographic information on Ivey Road to the limits of the project <br />area. <br />c. Trees 6" diameter breast height (dbh) and greater will be located and <br />identified along the banks of the canal. <br /> <br />3. Soils Consultant <br /> <br />CPH will retain the services of a soils consultant to investigate the soils conditions in <br />the area of pile placement The soils consultant scope of work is attached. <br />
The URL can be used to link to this page
Your browser does not support the video tag.