My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-1900 South Water Treatment Plant Forced Draft Aeration Project
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2008 Resolutions
>
08-1900 South Water Treatment Plant Forced Draft Aeration Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 5:33:50 PM
Creation date
9/10/2008 5:33:11 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
7/14/2008
Doc Number
08-1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Exhibit "A" <br /> <br />PROJECT NO. 0807 <br /> <br />SECTION 00500 <br /> <br />AGREEMENT <br /> <br />1. THIS AGREEMENT, made as of the /'Iii! day of .T" I Ltsw ' 2008, by <br />and between the City of Casselberry, Florida, hereinafter called the ner and Brandes <br />DesiQn-Build. Inc., hereinafter called the Contractor, <br /> <br />WITNESSETH, that the Owner and the Contractor, for the considerations stated herein, <br />agree as follows: <br /> <br />2. SCOPE OF WORK <br /> <br />The Contractor shall provide and furnish all of the necessary labor, supervision, material, <br />tools, expendable and permanent equipment, and all utility and transportation services <br />required to perform and complete in a workmanlike manner, all of the work described as: <br />"South Water Treatment Plant Forced Draft Aeration" for the City of Casselberry, <br />Florida. <br /> <br />All work shall be performed in strict accordance with the Drawings & Specifications <br />prepared by CPH Engineers, Inc., hereinafter called the Engineer, and in strict compliance <br />with the Contractor's Proposal as accepted, including any amendments agreed upon at the <br />time of execution of this Agreement, and with the other Contract Documents herein <br />mentioned which are a part of this Agreement. <br /> <br />3. THE CONTRACT PRICE <br /> <br />The Owner shall pay to the Contractor, and the Contractor shall accept, in full payment for <br />the performance of this Agreement, subject to any additions or deductions provided for <br />hereby, based upon the Lump Sum price provided in the proposal attached hereto, in <br />current funds, the Total Aggregate Amount shall not exceed the sum of: ONE MILLION <br />FIVE HUNDRED NINETY NINE THOUSAND DOLLARS and NOICENTS 1$1,599,000.001 <br />as a lump sum price contract. <br /> <br />Payments are to be made to the Contractor in accordance with and subject to the <br />provisions embodied in the other documents, which are a part of this Agreement. <br /> <br />4. CONTRACT TIME AND LIQUIDATED DAMAGES <br /> <br />Work under this Agreement shall be commenced within thirty (30) days after issuance of <br />written Notice to Proceed, and shall be completed within two hundred forty (240) calendar <br />days to Substantial Completion from the issuance of the written Notice to Proceed plus <br />fifteen (15) calendar days after receipt of FDEP clearance to Final Completion. Contractor <br />shall pay the Owners as liquidated damages the amount of ONE THOUSAND DOLLARS & <br />NO/100 ($1,000) for each calendar day that expires after the Contract Time specified <br />above including any adjustments thereof approved by proper Change Order until the Work <br />is finally complete. This amount represents an estimate of Owner's damages for loss of <br />use and administrative costs associated with delay. <br /> <br />00400-1 <br />City of Casselberry <br />
The URL can be used to link to this page
Your browser does not support the video tag.