My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-1665 Amendment No. 1 of Supplemental Agreement No. 3 TEI, Inc.
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2006 Resolutions
>
06-1665 Amendment No. 1 of Supplemental Agreement No. 3 TEI, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2007 12:07:54 PM
Creation date
4/5/2007 12:06:18 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
3/27/2006
Doc Number
06-1665
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2.03 Fee <br /> <br />The fee for this Amendment No.1 is (not to exceed) $54,386.99, without prior written <br />authorization. See Exhibit B. The amended Total Fee for Supplement No. 3 is <br />$433,271.22. <br /> <br />SECTION 3 <br /> <br />SUPPLEMENTARY SERVICES OF THE ENGINEER <br /> <br />A. If authorized by the OWNER, the ENGINEER shall furnish or obtain from others, <br />supplementary services of the following types which will be paid for by the <br />OWNER as an additional cost as outlined in Section 5; additional services due to <br />significant changes in the scope of the project or its design including, but not <br />limited to, changes in size, complexity, character of construction, or due to time <br />delays in initiating or completion of the work as described herein. <br /> <br />B. Provide through sUbconsultants, surveys, soils, environmental scientist services, <br />construction quality control testing or other specialist services. If these services <br />are subsequently determined advisable during the course of the work, they may <br />be considered for authorization as an additional service under this Section or <br />separately provided by the OWNER. <br /> <br />C. Except as otherwise provided herein, services or additional costs associated with <br />revising previously accepted studies, reports or other documents prepared by the <br />ENGINEER when such revisions are due to causes beyond the ENGINEER's <br />control. <br /> <br />D. Additional services resulting from public protests, administrative hearings or <br />similar matters. <br /> <br />E. Preparing to service and/or serving as an Expert Witness for the OWNER in any <br />litigation, public hearing, condemnation proceeding, right-of-way or easement <br />acquisition or negotiation or other legaVadministrative proceeding(s). <br /> <br />F. Furnishing additional sets of prints of drawings and other documents beyond <br />those designated in Section 2. <br /> <br />G. Additional engineering services required by revisions to regulations (after the <br />date of this Amendment) as applicable. <br />
The URL can be used to link to this page
Your browser does not support the video tag.