My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-1665 Amendment No. 1 of Supplemental Agreement No. 3 TEI, Inc.
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2006 Resolutions
>
06-1665 Amendment No. 1 of Supplemental Agreement No. 3 TEI, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2007 12:07:54 PM
Creation date
4/5/2007 12:06:18 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
3/27/2006
Doc Number
06-1665
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SECTION 1 <br /> <br />PURPOSE OF AMENDMENT <br /> <br />1.0 General <br /> <br />The purpose of this Amendment is to provide for additional services for the proposed <br />realignment plan for North Winter Park Drive from Seminola Boulevard to SR 434. The <br />anticipated work effort is described as follows. <br /> <br />SECTION 2 <br /> <br />SCOPE OF PROFESSIONAL TRANSPORTATION ENGINEERING <br />RELATED SERVICES <br /> <br />2.0 General Services of the Engineer <br /> <br />Provide additional survey, geotechnical investigation, environmental assessment and <br />engineering design for construction of additional stormwater detention ponds and <br />compensating treatment area, the SR 434 signal and the extension of utility services on <br />Belle Avenue. <br /> <br />2.01 General Scope of Services <br /> <br />See descriptions of Tasks 1 through 5 on attached Exhibit A. <br /> <br />2.02 Schedule <br /> <br />After approval of Amendment No.1 of Supplement NO.3: <br /> <br />· Receipt of survey and geotechnical survey - 7 weeks from Notice to <br />Proceed <br />· 90% Submittal - Submit 8 weeks from receipt of survey - (Includes drainage <br />system design, ponds, signing and marking, signals, box culvert design <br />structures, permit submittal, quantities, cost estimate) <br />· 100% Submittal - Submit 6 weeks from receipt of City's 90% comments <br />(Includes all project elements) <br />· Final Submittal - Submit 3 weeks from receipt of City's 100% comments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.