My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-1479 TEI, Inc. Supplement #1
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2004 Resolutions
>
04-1479 TEI, Inc. Supplement #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2005 2:54:23 PM
Creation date
6/2/2004 12:09:59 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
2/23/2004
Doc Number
04-1479
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Furnish or direct the ENGINEER in writing to provide at the OWNER's expense, <br />any subconsultant services not designated in SECTION 2, if advised by the <br />ENGINEER and OWNER concurs that they are necessary. <br /> <br />Furnish or direct the ENGINEER in writing to provide at the OWNER's expense, <br />necessary additional services as stipulated in SECTION 3 of this Supplement or <br />other services as required. <br /> <br />Provide such legal, accounting, financial and insurance counseling services as <br />may be required for the project in the City's opinion, and such auditing services <br />as the OWNER may require. <br /> <br />Give prompt written notice to the ENGINEER whenever the OWNER observes or <br />otherwise becomes aware of any material defect in the Project. <br /> <br />SECTION 5 <br /> <br />PAYMENT <br /> <br />5.0 Payment <br /> <br />The City agrees to pay the Consultant compensation as detailed in the Agreement <br />previously entered into on the 25th day of March 2002. <br /> <br />SECTION 6 <br /> <br />GENERAL CONDITIONS <br /> <br />Since the ENGINEER has no control over the cost of labor, materials or <br />equipment or over any construction method determining prices, any opinion of <br />probable construction cost which may be provided in the services of this <br />Supplement are made on the basis of his experience and qualifications and <br />represent his best judgment as a design professional familiar with the <br />construction industry, but the ENGINEER cannot and does not guarantee that <br />the construction cost will not vary from opinions of probable cost prepared by <br />him. Similar limitations apply to construction schedules reviewed or prepared by <br />the ENGINEER. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.