Laserfiche WebLink
<br />City Commission Meeting <br />October 10, 2005 <br />Page 8 <br /> <br />G. Resolution 05-1625 - Award of Bid - All Faiths Memorial Reclaimed Irrigation System, Project No. <br />0505 <br /> <br />The City Clerk read Resolution 05-1625 by title as follows: <br /> <br />"A RESOLUTION OF THE CITY OF CASSELBERRY, FLORIDA, AUTHORIZING <br />THE AWARD OF BID TO SOUTHERN LANDSCAPING & IRRIGATION <br />SYSTEMS, INe., TO CONSTRUCT THE ALL FAITHS MEMORlALRECLAIMED <br />WATER IRRIGATION SYSTEM; PROVIDING FOR CONFLICTS, <br />SEVERABILITY, AND EFFECTIVE DATE." <br /> <br />Staff Presentation: Mr. Goucher stated that All Faiths Memorial Park, under pressure from the St. Johns <br />River Water Management District, has agreed to cease irrigating with well water and connect to the City's <br />reclaimed water system. The City advertised for bidders to complete the necessary construction services <br />and the low bid was Southern Landscaping & Irrigation Systems, Inc. in the amount of$15,053.00. <br /> <br />Staff Recommendation: Award bid for install of the irrigation system to Southern Landscaping & <br />Irrigation Systems, Inc. <br /> <br />MOTION: <br /> <br />Moved by Commissioner Linda Hart to approve Resolution 05-1625, Award <br />of Bid/All Faiths Memorial Reclaimed Irrigation System, to Southern <br />Landscaping & Irrigation, Inc., as presented. The motion was seconded by <br />Commissioner Susan Doerner and carried unanimously by voice vote. (5 - 0) <br /> <br />H. Resolution 05-1626 - Amendment] to Supplemental Agreement No.3 for Design and Engineering <br />Services for the Re-alignment of Triplet Lake Drive with West Melody Lane <br /> <br />The City Clerk read Resolution 05-1626 as follows: <br /> <br />"A RESOLUTION OF THE CITY OF CASSELBERRY,FLORIDA, AUTHORIZING <br />THE EXECUTION OF AMENDMENT NO. I TO SUPPLEMENTAL AGREEMENT <br />NUMBER 3 TO THE CONTINUING SERVICES CONTRACT FOR ADDITIONAL <br />SURVEY AND TRANSPORTATION ENGINEERING SERVICES WITH <br />TRANSPORTATION ENGINEERING,INe. D/B/A TEl, FORDESIGN OF THE RE- <br />ALIGNMENT OF TRIPLET LAKE DRIVE WITH WEST MELODY LANE; <br />PROVIDING FOR CONFLICTS, SEVERABILITY, AND EFFECTIVE DATE." <br /> <br />Staff Presentation: The City has a Continuing Services Contract for transportation planning and <br />engineering related projects with Transportation Engineering, Inc. (TEl). Supplemental No.3 to TEl's <br />contract was approved to provide preliminary and final design phase services for the triplet Lake Drive Re- <br />alignment project. During the course of the design, it became necessary to design a new parking lot to <br />replace the parking that would be lost in front of City Hall with the widening of Triplet Lake Drive. The <br />additional design effort also requires additional surveying. Amendment 1 to Supplemental Agreement No. <br />3 is for additional Design and Engineering Services for the Re-alignment of Triplet Lake Drive with West <br />Melody Lane. <br />