My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-1603 Debris Reduction
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2005 Resolutions
>
05-1603 Debris Reduction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2005 12:59:09 PM
Creation date
10/27/2005 12:57:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
7/25/2005
Doc Number
05-1603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />than 2 feet in diameter will be disposed of by either splitting and burning, or <br />chipping/grinding. The method will be at the discretion of the Contractor. <br /> <br />3.6 Ash. Ash is the residue produced by incineration of the burnable debris. When <br />handling ash, it will be required to "wet down" the ash to prevent dust problems. <br /> <br />3.7 ChipslMulch. Chips and mulch are the end product of chipping or grinding wood <br />products. Proper disposal of chips and mulch is to find environmentally friendly (non- <br />landfill disposal) use for the material. <br /> <br />4. PERFORMANCE SCHEDULE. <br /> <br />4.1 Immediately following Bid Opening, the apparent low bidder will meet with the <br />CITY to discuss matters of judgment, safety, quality control, coordination, payment, <br />record keeping, and reporting. <br /> <br />4.2 Schedule. The Contractor shall begin preparation for mobilization immediately after <br />Notice to Proceed and be fully operational within 120 hours after Notice to Proceed. <br /> <br />4.3 Production. The Contractor is required to process a minimum of ISO to 180 CY per <br />hour, cubic yards of debris per calendar day. The minimum required reduction/disposal <br />rate shall be achieved no later than the second calendar day after receipt of Notice to <br />Proceed. This minimum production rate is increased to 180 to 210 CY per hour in the <br />event that the City exercises the option for additional reduction capacity. <br /> <br />4.4 Completion. All work, including site restoration prior to close-out, shall be <br />completed within ten (10) calendar days after receiving notice rrom the CITY that the last <br />load of debris has been delivered, unless the City initiates additions or deletions to the <br />contract by both parties pursuant to applicable State and Federal law. <br /> <br />5. EQUIPMENT. <br /> <br />5.1 The contractor shall provide all equipment necessary to prepare the site, stockpile the <br />debris, feed the air curtain incinerator(s), remove ash rrom the incinerator(s), load and <br />haul for disposal all non-burnable debris and ash residue, and any other equipment which <br />may be necessary for the perfonuance of this contract. The Contractor shall comply with <br />local, tribal, State and Federal safety and health requirements. <br /> <br />5.2 All equipment must be in compliance with all applicable Federal, State, tribal and <br />local rules and regulations. All equipment and operator qualifications will meet the <br />requirements of local, tribal, State and federal safety and health requirements. The <br />contractor using the applicable inspection fonus will inspect equipment prior to its use. <br />The completed fonus will be provided to the City. <br /> <br />5.3 Prior to commencing debris reduction and disposal operations, the Contractor shall <br />present to the Contracting Officer or his representative, the CITY, for approval, a detailed <br /> <br />Scope of Work - Reduction & Site Management <br />May 2005 <br />Page 3 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.