Laserfiche WebLink
<br />ENGINEERING SITE CONSTRUCTION PERMIT COSTS 8/05 <br /> <br />Organization Fee Rate <br />Casselberry 1% of infrastructure costs <br />Seminole Countv 1 .44% of infrastructure costs <br />Altamonte Sprinas 1.5% of infrastructure costs <br />Lake Mary 1% of infrastructure costs or a <br /> minimum of $200 <br />Longwood No separate permit issued, <br /> covered under $1000 site review <br /> fee <br />Oviedo $500 flat fee rate <br />Sanford 1% of infrastructure costs or a <br /> $50 minimum <br />Winter Sprinas 1% of infrastructure costs <br />AVERAGE 1.16% of Infrastructure costs <br />