My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-1555 Water Tank Repair
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2005 Resolutions
>
05-1555 Water Tank Repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2005 2:54:57 PM
Creation date
2/18/2005 9:38:12 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
2/14/2005
Doc Number
05-1555
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />"EXHIBIT All <br /> <br /> <br />LELS <br /> <br />I N C a; R P CI R A'T E D <br /> <br />January 11, 2005 <br />Revised January 18, 2005 <br /> <br />PROPOSAL <br /> <br />MODIFICATIONS <br />250,000-GALLON GROUND STORAGE TANK <br />UPGRADE TO 3800 GPM AERATOR <br />CITY OF CASSELBERRY, FLORIDA <br />CASSELBERRY, FLORIDA <br /> <br />Crom Engineering and Construction Services, Inc. (CECS) proposes to provide services <br />for the modifications to the 250,000-gallon prestressed concrete tank, in accordance with <br />all applicable codes and standards including OSHA, AWWA, ACI and standard <br />prestressed concrete tank design. <br /> <br />1. REQUIRED DATA <br /> <br />Prior to starting work, Crom Engineering and Construction Services, Inc. will <br />gather all applicable data required to review the service life of the afore mentioned <br />storage tank including any available computations, detailed drawings, and <br />specifications. <br /> <br />2. COMMENCEMENT AND COMPLETION <br /> <br />Upon your execution of this proposal, we will be prepared to start work 8 weeks <br />after said approval and will undertake to furnish sufficient labor, materials, and <br />equipment to complete the work within approximately 2 weeks working time <br />thereafter. <br /> <br />In the event that we cannot start the job by January 1, 2006 because of delays of <br />any nature, which are caused by the owner, or other contractor employed by him <br />and over which we have no control, then the contract price may be renegotiated <br />to reflect any increased costs. <br /> <br />3. INSURANCE <br /> <br />We hereby certify that we have complete Workers' Compensation Insurance, and <br />that we carry adequate Liability and Property Damage Insurance as well as <br />Builders' Risk Insurance. A certificate will be furnished by our insuring agency <br />upon request. <br /> <br />CROM ENr.UNEER1N8 Eì CONSTRUCTION SERVICES. INC. <br />250 åw 36th Terrace· Gainasville, florida 32607 . 352-372-3436 Fax: 352-312-6209 <br />
The URL can be used to link to this page
Your browser does not support the video tag.