Laserfiche WebLink
<br />RIW 1m acts <br />R/W Acquisition (acres) 0.00 8.20 7.77 14.33 8.28 14.94 <br />R/W Acquisition (parcel count) 0 36 34 31 35 37 <br />Traffic Operations <br />Travel Time Reduction <br />A.M. Peak Hour 0% 57% 58% 53% 54% 54% <br />PM. Peak Hour 0% 59% 50% 53% 45% 57% <br />Traffic Operations Ranking (1-best) 6 1 3 4 5 2 <br />Environmental Impacts <br />Potential Wetland Impacts None Low Low Low Low Low <br />Potential Impact to Wildlife Habitat None Low Low Low Low Low <br />Potential Chan e in Noise Levels None Minimal Minimal Minimal Minimal Minimal <br />Potential Air Quality Impact Medium Low Low Low Low Low <br />Number of Potential Contamination 0 7 7 7 7 7 <br />Sites rated Medium or Hi h <br />Estimated Construction Cost $21,420,000 $24,200,000 $17,680,000 $25,400,000 $22,270,000 <br />En ineering, CEI, Admin 27% $5,780,000 $6,530,000 $4,770,000 $6,860,000 $6,010,000 <br />Right of Way Costs $5,720,000 $6,030,000 $10,741,000 $6,250,000 $11,120,000 <br />Total $32,920,000 $36,760,000 $33,191,000 $38,510,000 $39,400,000 <br />