My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC Minutes 09/07/2004
Laserfiche
>
City Clerk's Public Records
>
Minutes
>
City Commission Minutes
>
City Commission Minutes Archives
>
2004 City Commission Minutes
>
CC Minutes 09/07/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2005 2:54:47 PM
Creation date
1/10/2005 9:15:08 AM
Metadata
Fields
Template:
City Clerk
Meeting Type
Special
City Clerk - Doc Type
Minutes
City Clerk - Date
9/7/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Date: <br /> <br />To: <br /> <br />From: <br /> <br />Subject: <br /> <br />City of Casselberry <br />Assistant Public Works Director <br /> <br />95 Triplet Lake Drive, Casselberry, Florida 32707 . Telephone (407) 262-7725, Ext. 1234 <br />Fax (407) 262-7767 . Email cityengineer@casselberry.org <br /> <br />September 7, 2004 //J <br /> <br /> <br />Tony Segreto, Public Works Director ~ <br /> <br /> <br />Bill Goucher, Assistant Public Works Director ~ <br /> <br />Hurricane Frances - Generator & Bypass Pump Needs <br /> <br />As a result of Hurricane Charley, and Hurricane Frances, the following are needed: <br /> <br />· Replacement of 500 KW standby generator at Water Reclamation Facility (was <br />proposed for next year's budget, but is no longer operable) - $80,000. <br /> <br />· Replacement of 150 KW standby generator at City Hall with 250 KW (150 does <br />not power entire City Hall and air conditioning unit) - $60,000. <br /> <br />· Additional 1 0 portable standby generators for Lift Stations - $27,000 each, for <br />total of $270,000. <br /> <br />· Additional 4 gasoline-powered bypass pumps for Lift Stations - $27,000 each, for <br />total of $108,000. <br /> <br />· Electrical work for automatic transfer switches, and miscellaneous electrical - <br />$40,000. <br /> <br />Total cost is approximately $558,000. The City of Casselberry has a continuing contract <br />with Alternative Power Solutions, who have served the City admirably during the two <br />hurricane events. <br /> <br />www,casselberry.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.