Laserfiche WebLink
DocuSign Envelope ID: OAC4FC19-7B37-4184-8E57-CB34C958FC81 <br />SUPPLEMENTAL NO. <br />CONTRACT NO. <br />G2M10 <br />FPN <br />439064-1-58-01 <br />STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION <br />LOCAL AGENCY PROGRAM <br />SUPPLEMENTAL AGREEMENT <br />FEDERAL ID NO. (FAIN) <br />D522 076 B <br />FEDERAL AWARD DATE <br />06/15/2023, 12/07/2023 <br />525-010-32 <br />PROGRAM MANAGEMENT <br />03/22 <br />Page 1 of 4 <br />RECIPIENT UNIQUE ENTITY ID SAM NO, <br />H4NBXKKRHB94 <br />Recipient, (the City of Casselberry), and the Florida Department of Transportation desires to supplement <br />the original Agreement entered into and executed on June 20, 2023 as identified above. All <br />provisions in the original Agreement and supplements, if any, remain in effect except as expressly modified by this <br />supplement. <br />The changes to the Agreement and supplements, if any, are described as follows: <br />PROJECT DESCRIPTION <br />Name Southcot Drive Sidewalk Length — 0.241 miles <br />Termini Between Sunset Drive and Lake Triplett Drive <br />Description of Work: <br />The Southcot Drive Sidewalk project is with the City of Casselberry (Recipient). The primary intent of this project is to <br />enhance the bicycle/pedestrian safety and connectivity by narrowing the travel lanes, adding a wider sidewalk, and <br />including other complete street enhancements. The construction improvements are along the north side of Southcot Drive <br />between Sunset Drive and Lake Triplett Drive for an approximate total length of 0.241 miles. Project scope includes milling <br />and resurfacing, construction of curb and gutter (along the north side of the corridor), wider concrete sidewalk, and <br />driveway reconstruction. Detectable warning surfaces will be placed on all curb ramps/ramps. Drainage improvements <br />include installation of pipe and curb inlets. A raised midblock crossing is proposed approximately 550 feet east of Sunset <br />Drive along with two sets of speed cushions. Signage and thermoplastic striping will be added to this project. Additionally, <br />mobilization, maintenance of traffic (MOT), erosion control, clearing and grubbing, removal of existing concrete, sodding, <br />excavation, and embankment are also included as part of this project. <br />The roadway improvements (excavation, embankment, milling, inlets, pipe, type F curb and gutter) are not eligible for <br />federal reimbursement due to Southcot Drive not being listed on the Federal Aid System. <br />All pedestrian facilities shall adhere to current ADA standards. Utility coordination is required and has been coordinated. <br />Utility coordination will be required during construction and utility work schedules have been developed. The City of <br />Casselberry (Recipient) shall construct the project within the limits of the existing right-of-way. <br />Reason for Supplement and supporting engineering and/or cost analysis: <br />1. Pursuant to Paragraph 4.0 Project Cost of the Local Agency Program Agreement, the Recipient and the Department <br />acknowledge and agree that the Schedule of Funding for Construction that includes the authorized and encumbered Federal <br />funding and the Local funding contribution on the project shall be decreased to an amount equal to the Recipient's <br />construction contract award amount of $522,017.00. This results in a decrease of total construction funding by $28,341.00. <br />The federal funding is to be increased by $148,226.00, which is the difference between previous federal funding of <br />