Laserfiche WebLink
U7 10/22/2013 STANDARD DETAILS <br />to U12 <br />(b) CITY acknowledges and agrees that COUNTY review of the CITY <br />Construction Design Plans may require CITY to make changes to the plans or submit <br />additional information to COUNTY. <br />(c) CITY will not be financially liable for any additional work beyond that <br />specified in the CITY Construction Design Plans and the specifications in the awarded <br />contract, without advance notification and concurrence of the CITY incorporated in a <br />Change Order. If, in the opinion of COUNTY's consulting engineer, an emergency exists, <br />the consulting engineer may authorize measures, which in his or her professional opinion, <br />are reasonably necessary to prevent or mitigate any resulting damages that might result <br />from the emergency. If the COUNTY's consulting engineer authorizes measures without <br />prior review and concurrence of CITY, COUNTY shall provide after the fact verbal or <br />telephonic notice to CITY as soon as practical, but at least within three (3) days to CITY. <br />Apart from emergencies, CITY will not be financially liable for any additional work <br />beyond that specified in CITY Constriction Design Plans and the specifications in the <br />awarded contract without advance notification and written concurrence of CITY. <br />COUNTY shall contact and consult with the CITY regarding the need for conflict <br />structures not included in the CITY Construction Design Plans or County Construction <br />Design Plans, and, if deemed necessary, CITY will be responsible to pay for the cost of <br />conflict structures. <br />(d) Additional work required for the CITY Utility Work beyond that specified <br />in the COUNTY Contract requested by either COUNTY or CITY may be authorized by <br />Seminole County and City of Casselberry <br />Interlocal Utility Construction Agreement Oxford Road and English Estates Projects <br />Page 5 of 24 <br />