Laserfiche WebLink
EXHIBIT A <br />SCOPE OF SERVICES <br />AMENDMENT NO.2 OF SUPPLEMENT NO.1 <br />PLUMOSA AVE. AT US 17/92 IMPROVEMENTS <br />A. ROADWAY PLANS <br />Task 1. Design Analysis <br />The alignment through the US 17/92 intersection will be changed to minimize <br />the Florida Department of Transportation's (FDOT) concern of an offset <br />intersection between the Home Depot driveway and Plumosa Avenue. TEI will <br />prepare conceptual layouts of the revised alignment for the City's and FDOT's <br />review. TEI will finalize the intersection geometry and update project quantities <br />for a resubmittal of the 90% plans followed by the submittal of final plans. TEI <br />will attend progress/review meetings with City and FDOT staff. <br />Task 2. TEI will redesign the stormwater collection system on Plumosa Ave. within the <br />project limits and update the drainage calculation report. <br />Task 3. TEI will revise the Plan sheets to depict the new alignment on Plumosa Avenue <br />and revisions to the current Home Depot driveway alignment shown in the <br />plans. Cross Sections sheets, a Construction Detail sheet, Retaining Wall sheets <br />and Summary of Quantities sheet will be revised. <br />Task 4. TEI will modify the Summary of Drainage Structures, add the drainage <br />structure information to the Plumosa Avenue plan sheets and will provide a <br />detail for modifications to the Home Depot detention pond berm. <br />Task 5. TEI will update the Traffic Control Plan phasing notes and will add a detour <br />plan for Plumosa Avenue construction. <br />Task 6. TEI will coordinate with and resend the plans to Utility Owners to solicit <br />information regarding existing locations and proposed relocation of facilities. <br />B. SIGNING AND MARKING PLANS <br />TEI will modify the Signing and Pavement Marking plans to include Plumosa Avenue. <br />The General Note sheet and Tabulation of Quantities sheet will be revised. <br />C. SIGNALIZATION PLANS <br />1 <br />