Laserfiche WebLink
10. Develop nutrient budget: Nutrient budgets will be developed for Queens Mirror Lake <br />and each of the Triplet Lakes which includes inputs from bulk precipitation, stormwater <br />runoff, internal recycling, and groundwater seepage. Inputs from bulk precipitation will be <br />calculated using typical bulk precipitation characteristics for the Central Florida area. <br />Inputs from stormwater runoff will be estimated using typical literature -based values or <br />actual stormwater monitoring data for the watershed, if available. Phosphorus loading as a <br />result of internal recycling will be calculated based upon the field and laboratory monitoring <br />conducted by ERD. Nutrient inputs from groundwater seepage will be estimated based <br />upon the field monitoring program. The results of the nutrient budget will be presented in <br />both graphical and tabular formats. <br />11. Prepare Draft Final Report: A Draft Final Report will be prepared which presents the <br />results of the previous tasks, along with water quality management recommendations. A <br />digital PDF version of the report will be provided to the City for review. <br />12. Attend review meeting: Representatives from ERD will attend a review meeting with <br />representatives from the City to discuss the Draft Final Report. <br />13. Prepare Final Report: After receiving comments from the City, a Final Report will be <br />prepared for the project. Five hard copies and one digital copy (PDF format) of the Final <br />Report will be submitted to the City. <br />Project Schedule <br />A project schedule is attached. The project is expected to require approximately 14 months for <br />completion. <br />PROPS \QUEENS MIRROR/PRIPLET CHAIN -OF -LAKES HYDROLOGIC -NUTRIENT BUDGET EVALUATION FEE -AUGUST 2010 PAGE 6 <br />