My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-2163 Approval/Execution of Supplemental Agreement 2 to the Standard Consultant Agreement- continuing Pro Stormwater, Lakes Management and Water Quality Engineering Services
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2010 Resolutions
>
10-2163 Approval/Execution of Supplemental Agreement 2 to the Standard Consultant Agreement- continuing Pro Stormwater, Lakes Management and Water Quality Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2022 1:16:10 PM
Creation date
8/16/2022 1:15:06 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
8/23/2010
Doc Number
10-2163
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10. Develop nutrient budget: Nutrient budgets will be developed for Queens Mirror Lake <br />and each of the Triplet Lakes which includes inputs from bulk precipitation, stormwater <br />runoff, internal recycling, and groundwater seepage. Inputs from bulk precipitation will be <br />calculated using typical bulk precipitation characteristics for the Central Florida area. <br />Inputs from stormwater runoff will be estimated using typical literature -based values or <br />actual stormwater monitoring data for the watershed, if available. Phosphorus loading as a <br />result of internal recycling will be calculated based upon the field and laboratory monitoring <br />conducted by ERD. Nutrient inputs from groundwater seepage will be estimated based <br />upon the field monitoring program. The results of the nutrient budget will be presented in <br />both graphical and tabular formats. <br />11. Prepare Draft Final Report: A Draft Final Report will be prepared which presents the <br />results of the previous tasks, along with water quality management recommendations. A <br />digital PDF version of the report will be provided to the City for review. <br />12. Attend review meeting: Representatives from ERD will attend a review meeting with <br />representatives from the City to discuss the Draft Final Report. <br />13. Prepare Final Report: After receiving comments from the City, a Final Report will be <br />prepared for the project. Five hard copies and one digital copy (PDF format) of the Final <br />Report will be submitted to the City. <br />Project Schedule <br />A project schedule is attached. The project is expected to require approximately 14 months for <br />completion. <br />PROPS \QUEENS MIRROR/PRIPLET CHAIN -OF -LAKES HYDROLOGIC -NUTRIENT BUDGET EVALUATION FEE -AUGUST 2010 PAGE 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.