My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-2162 Approval/Execution of Supplemental Agreement 2 to the Standard Consultant Agreement-Continuing Pro Water/Sewer utility Engineering Services
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2010 Resolutions
>
10-2162 Approval/Execution of Supplemental Agreement 2 to the Standard Consultant Agreement-Continuing Pro Water/Sewer utility Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2022 1:13:36 PM
Creation date
8/16/2022 1:12:07 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
8/23/2010
Doc Number
10-2162
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRAFT <br />- Evaluate the looping mains alternative to increase flow and pressure to dead-end <br />mains (6 -inch and greater) throughout the distribution system. <br />- Evaluate the need for each of the City's three elevated storage tanks in the <br />distribution system. <br />Task 8.4 — CIP Project Identification <br />REI will: <br />- Identify the proposed CIP projects based on technically feasible alternatives evaluated <br />on the findings of the previous sub -task. <br />- Prepare preliminary estimates of probable cost estimates for financial evaluation. <br />- Prepare a hydraulic capacity and future conditions analysis summary of this <br />investigation for the purposes of developing the final Master Plan Report. <br />Task 8.5 — Fire Flow Analysis Review <br />REI will: <br />- Review and update the City's current fire flow analysis requirements, as needed. <br />- Develop recommendations to improve water distribution system pressure and <br />available fire flow, as needed. <br />- Document model results and recommendations in the Water Quality Optimization and <br />Evaluations section of the Master Plan Report. <br />Data Required: List of CIP projects, City identified looping areas, City staff availability <br />Deliverables: <br />♦ Hydraulic capacity analysis <br />TASK 9.0 — DISTRIBUTION WATER QUALITY OPTIMIZATION <br />The calibrated model can be used to optimize the operations of the distribution system, <br />evaluate alternatives to reduce DBP formation and simulate various valve setting and/or <br />looping options to minimize water age. <br />Task 9.1 Pressure Zone and Looping Evaluation <br />REI will: <br />- Develop two evaluations scenarios, one pressure zone and one looping scenario, and <br />provide recommendations to improve chlorine residuals in the selected areas of the <br />distribution system previously identified by REI. <br />- Meet with City staff to discuss the alternatives and select a recommended alternative. <br />The Model scenario setup and operation would be presented for discussion and <br />Page 8 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.