My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-2112 Agreement with JRGO for Construction Administration/Inspection Services for Water Quality Improvement Projects
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2010 Resolutions
>
10-2112 Agreement with JRGO for Construction Administration/Inspection Services for Water Quality Improvement Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2022 11:45:15 AM
Creation date
8/15/2022 11:41:39 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
1/25/2010
Doc Number
10-2112
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONTRACTUAL SERVICES <br />Page 3of7 <br />B. The ENGINEER will serve as the OWNER's professional engineering <br />representative in those phases of the project to which this Supplement <br />applies and will meet, consult with, and provide advice to the OWNER <br />during the performance of these services. The ENGINEER will perform <br />the services for the City Commission under the direction of the Public <br />Works Director. The Principal -in -Charge will be John Geise and the <br />Project Manager will be Jim Williams, P.E. <br />C. The ENGINEER will attend and participate in regular progress meetings <br />and conferences with the OWNER. <br />D. The ENGINEER represents that all personnel engaged in the work shall <br />be fully qualified. <br />E. Other subconsultant services are included as part of the Supplement. <br />F. The ENGINEER shall promptly begin work on the services authorized by <br />this Supplement upon execution of this Supplement. <br />SECTION 4 <br />SUPPLEMENTARY SERVICES OF THE ENGINEER <br />4.0 Supplementary Services <br />A. If authorized by the OWNER, the ENGINEER shall furnish or obtain from <br />others, supplementary services of the following types which will be paid for <br />by the OWNER as an additional cost as outlined in Section 6. <br />B. Additional services due to significant changes in the scope of the project <br />including, but not limited to, changes in size, complexity, character, or due <br />to time delays in initiating or completion of the work as described herein. <br />C. Provide specialty services through Subconsultants. If these services are <br />subsequently determined advisable during the course of the work, they <br />may be considered for authorization as an additional service under this <br />Section of the Supplement or separately provided by the OWNER. <br />D. Except as otherwise provided herein, services or additional costs <br />associated with revising previously accepted studies, reports, or other <br />documents prepared by the ENGINEER when such revisions are due to <br />causes beyond the ENGINEER's control. <br />E. Additional services resulting from public protests, administrative hearings, <br />or similar matters. <br />
The URL can be used to link to this page
Your browser does not support the video tag.