My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-2112 Agreement with JRGO for Construction Administration/Inspection Services for Water Quality Improvement Projects
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2010 Resolutions
>
10-2112 Agreement with JRGO for Construction Administration/Inspection Services for Water Quality Improvement Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2022 11:45:15 AM
Creation date
8/15/2022 11:41:39 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
1/25/2010
Doc Number
10-2112
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 <br />J.R. Giese operations, LLC <br />WATER AND WASTE WATER SOLUTIONS PROVIDER <br />CXHZbzT Fb <br />January 15, 2010 <br />Mr. Alan Ambler, P.E. <br />Utility Manager <br />City of Casselberry <br />95 Triplet Lake Drive <br />Casselberry, Florida 32707 <br />RE: Scope of Work for <br />Casselberry ARRA Funded <br />Water Quality Improvement Projects <br />Supplemental Agreement # 1 <br />Dear Mr. Ambler: <br />We have prepared this supplemental proposal for professional engineering services to <br />provide assistance to the City for the above referenced project. The services will include <br />construction phase services. <br />PROJECT DESCRIPTION <br />The water rehabilitation work included in this project covers seven separate areas. Each <br />is intended to be completed as an individual project to minimize the construction duration <br />in any one area. Completion of one area is desired before starting additional areas. <br />SCOPE OF WORK <br />Based on our understanding of the project we have prepared the following scope of work <br />to assist the City of Casselberry during the design, bid, and construction phase of this <br />project. Our original proposal dated September 12, 2009 was based on an eight (8) <br />month maximum construction duration. This updated proposal reflects increases for <br />certain items (see Attachment A) to accommodate the sixteen (16) month construction <br />duration submitted by the contractor. <br />Construction Phase Services <br />1. Monthly construction progress meeting. <br />2. Review and recommend approval of contractor's invoices. <br />3. Review contractor's monthly schedule updates. <br />SERVICES NOT INCLUDED <br />The following services are not included with this proposal: survey, wetland mitigation, <br />real estate or easement acquisition, permit fees, and utility locates. <br />COMPENSATION FOR SERVICES <br />Our fee for the above described scope of work is $24,900.00 lump sum, payable on a <br />percent complete basis. <br />3560 Cardinal Point Dr. Suite 201 Jacksonville, FL 32257 <br />Office (904) 730-7994 Fax (904) 221-7521 <br />
The URL can be used to link to this page
Your browser does not support the video tag.