My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 01/10/2022 Minutes
Laserfiche
>
City Clerk's Public Records
>
Minutes
>
City Commission Minutes
>
City Commission Minutes Archives
>
2022 City Commission Minutes
>
CC 01/10/2022 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2022 11:03:49 AM
Creation date
3/1/2022 11:03:41 AM
Metadata
Fields
Template:
City Clerk
Meeting Type
Regular
City Clerk - Doc Type
Minutes
City Clerk - Date
1/10/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CASSCLBERRY CITY COMMISSION <br />Minutes of January 10, 2022 — Regular Meeting <br />Page 5 of 13 <br />Introduction: Consideration of approval of Task Authorization No. 1 with Wright -Pierce, Inc. which <br />provides for Construction Engineering Inspection Services for the US Highway 17/92 Water Main Looping <br />project in the amount of $173,425 is requested. <br />Budget Impact: Budget Amendment #22-020, associated with the award of the US Highway 17/92 Water <br />Main Looping project presented as a separate item on this Commission agenda, provides ample funding in <br />the FY 22 Water & Sewer Capital Improvement Fund Distribution & Collection Infrastructure account <br />#403-0751-536.63-40 to complete this work. <br />Recommendation: The City Manager and the Public Works Director recommended approval of Task <br />Authorization No. 1 with Wright -Pierce, Inc. for construction engineering inspection services for the US <br />Highway 17/92 Water Main Looping project in an amount not to exceed $1.73,425. <br />Piggyback Agreement for Purchase and Installation of Large Pavilion for the Secret <br />Lake Park Improvements Project <br />Introduction: Consideration of approval of an agreement for the purchase and installation of a pavilion <br />from Rep Services, Inc. in the amount of $222,338.28 for the Secret Lake Park Improvements Project by <br />piggybacking Clay County Contract #18/19-2 is requested. (Ref. PW 1907 and PBA -2022-0851) <br />Budget Impact: Sufficient funding is budgeted and available in Parks Master Plan Fund Machinery & <br />Equipment Account #307-0410-572.67-36 for this purchase. <br />Recommendation: The City Manager and the Public Works Director recommended approval of agreement <br />PBA -2022-0851 for purchase and installation of a large pavilion from Rep Services, Inc. in the amount of <br />$222,338.28 for Project PW 1907 Secret Lake Park Improvements. <br />Task Authorization No. 6 with Geosyntec Consultants Inc for Additional Design <br />and Post -Design Services for the Queens Mirror Nutrient Reduction Facility Project <br />Introduction: Consideration of approval of Task Authorization No. 6 With Geosyntec Consultants, Inc. <br />in the amount not to exceed $77,248.02 to provide additional design and post -design services for the Queens <br />Minor Nutrient Reduction Facility project is requested. (Ref. SOQ-201.9-0424 and PW 1706) <br />Budget Impact: Sufficient funding is budgeted and available for this item in Stormwater Utility Fund <br />Equipment Other Account #110-0740-538.67-35. <br />Recommendation: The City Manager and the Public Works Director recommended approval of Task <br />Authorization No. 6 with Geosyntec Consultants, Inc. in the amount not to exceed $77,248.02. <br />K. FY 2022-2023 Capital and Operating Budget Calendar <br />Introduction: Consideration of approval of the FY 2022-2023 budget calendar is requested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.