Laserfiche WebLink
SECTION 1 <br />PURPOSE OF SUPPLEMENT <br />The purpose of this Supplement is to provide for Part-time Construction Field <br />Representative Services during the construction phase of the Sausalito Shores Outfall <br />Improvements at Lake Howell consisting of the construction/installation of three (3) <br />baffle boxes and five (5) inlet inserts. <br />SECTION 2 <br />SCOPE OF SERVICES <br />2.0 General <br />The Scope of Services is attached as Exhibit 1. <br />SECTION 3 <br />GENERAL SERVICES OF THE ENGINEER <br />3.0 General <br />A. The ENGINEER shall provide all services required to complete the task in <br />accordance with the regulatory requirements in effect on the date of this <br />Supplement to the extent of the scope of work as defined and set out in this <br />Supplement. The ENGINEER shall perform professional services as <br />hereinafter stated in accordance with good engineering practices. <br />B. The ENGINEER will serve as the OWNER's professional engineering <br />representative in that phase of the project to which this Supplement applies <br />and will meet, consult with, and provide advice to the OWNER during the <br />performance of these services. The ENGINEER will perform the services for <br />the City Commission under the direction of the Public Works Director or his <br />designee. The Principal -in -Charge will be Terry M. Zaudtke, P.E., BCEE and <br />the Construction Field Representative (CFR) will be Lawrence Pultz, P.E. <br />C. The CFR will attend and participate in regular progress meetings and <br />conferences with the OWNER. <br />D. The ENGINEER represents that all personnel engaged in the work shall be <br />fully qualified. <br />E. The ENGINEER shall promptly begin work on the services authorized by this <br />Supplement upon execution of this Supplement and will complete the <br />specified services in a timely manner. <br />Page 2 of 11 <br />