TASK 1 — Part-time Construction Field Representative Services <br />1. The ENGINEER shall provide Construction Field Representative Services during the <br />construction contract and schedule. The project includes the construction of three <br />stormwater baffle boxes and five inlet inserts. This scope of service includes <br />provisions for part-time observation of work for compliance with Plans and <br />Specifications on more or less a continuing basis as construction proceeds; <br />notification of the Contractor of non-compliance; observation of materials at their <br />source or in the job site; and provide a record of the Contractor's activities <br />throughout the construction, including notations on the nature and cost of any extra <br />work or changes ordered during construction; however, the ENGINEER is not <br />responsible for the performance of the construction contract by the Contractor. The <br />ENGINEER will provide a Construction Field Representative (CFR) to observe the <br />Contractor's work during the execution of the Construction Contract on a part-time <br />basis. <br />2. Through the on-site observations of the work including progress and field checks of <br />material and equipment by the CFR, the ENGINEER will endeavor to provide <br />protection for the OWNER against defects and deficiencies in the work, but the <br />furnishing of such resident project representation shall not make the ENGINEER <br />responsible to find or note all discrepancies in the work nor for the Contractor's <br />failure to perform the construction work in accordance with the Contract Documents. <br />3. The ENGINEER and CFR shall not be responsible for the acts or omissions of the <br />Contractor nor of any of the Contractor's, Sub -Contractors, Agents, Employees, or <br />other persons performing any of the work under the construction contract, or of <br />others. <br />4. The CFR will assist the OWNER in issuing all instructions to the Contractor and <br />assist in the preparation of routine Change Orders as may be required. The CFR <br />may, as a designated project representative by the OWNER, require special <br />inspection or testing of the work (whether or not fabricated, installed or completed). <br />The CFR will coordinate with the OWNER to respond to RFI's from the Contractor. <br />5. The CFR will conduct bi-weekly meetings throughout the duration of the project. The <br />project duration is anticipated to be 27 weeks, but the actual active construction <br />period will be 25 weeks. The meetings are anticipated to last for approximately one <br />hour each. <br />Page 8 of 11 <br />