Laserfiche WebLink
Significant Capital Projects by Water Utility Divisions comprise the following: <br />Distribution & Collection: Improvements of $500,000 at the Red Bug Lake Road/S.R. 436 Intersection <br />and renovations at the Winter Woods Lift Station approximating $250,000, as well as $110,000 allocated <br />for new water and sewer and reclaimed lines. <br />Water Production: The purchase of the Howell Park Plant Hydro Surge Tank estimated at $100,000. <br />The proposed budget for this fund represents 33% of the City-wide total budget. The Water and Sewer <br />Utility Fund services potable water, wastewater, and reclaimed water. The revenue for this fund <br />includes $14,118,383 in utility service charges for the 54,000 consumers served by the Utility. Water, <br />sewer and reclaimed water rates have been approved to increase by the Commission consistent with <br />the recommendations of an independent rate study to maintain the financial health of the enterprise. <br />Approved rate adjustments through FY 2012 for single family residential rates inside the City with 7,900 <br />gallons (average) water and sewer and 12,000 gallons of reclaimed water consumption are show below: <br />The Water & Sewer Utility Fund will yield an operating surplus of almost $600,000 in FY 2012. A surplus <br />is being accumulated in this fund to pay off the ARRA loans at project completion instead of financing <br />these projects over a long-term period. <br />Water and Sewer Renewal and Replacement Fund <br />Significant Capital Projects of $1,106,750 are appropriated by Department Division as follows: <br />Distribution and Collection: Renovations at the Woodcrest Lift Station approximating $125,000 and the <br />Gravity System Mainline U -lining Inflow/Infiltration system estimated at $100,000. <br />Water Reclamation: Clarifier Rehabilitation for Plant I approximated at $375,000 and the remodel of the <br />Wastewater Laboratory for $133,000. <br />Water Production is expending $109,000 for rehabilitation on the North and South Wells and an <br />additional $135,000 for the remodel of the South and North Water Treatment buildings. <br />Water and Sewer Capital Improvement Fund <br />The Water and Sewer Capital Improvement Fund captures impact fees from water and sewer <br />connections from new development. Amounts related to the Triplet Lake Signature Street project of <br />$406,600 have been proposed for FY 2012. <br />Water and Sewer Alternative Water Supply Fund <br />The Water and Sewer Alternative Water Supply Fund is reserving funds for future investment to share in <br />the development of an alternative water supply. A transfer of $400,000 is proposed for FY 2012. Ending <br />FY 2012 fund balance is projected at $1,200,000. <br />A-10 <br />. <br />>ON <br />FY 2011 <br />FY 2012 <br />Variance <br />Water <br />$18.70 <br />$19.64 <br />5.0% <br />Wastewater <br />$47.69 <br />$52.46 <br />10.0% <br />Reclaimed Water <br />$15.69 <br />$16.47 <br />5.0% <br />The Water & Sewer Utility Fund will yield an operating surplus of almost $600,000 in FY 2012. A surplus <br />is being accumulated in this fund to pay off the ARRA loans at project completion instead of financing <br />these projects over a long-term period. <br />Water and Sewer Renewal and Replacement Fund <br />Significant Capital Projects of $1,106,750 are appropriated by Department Division as follows: <br />Distribution and Collection: Renovations at the Woodcrest Lift Station approximating $125,000 and the <br />Gravity System Mainline U -lining Inflow/Infiltration system estimated at $100,000. <br />Water Reclamation: Clarifier Rehabilitation for Plant I approximated at $375,000 and the remodel of the <br />Wastewater Laboratory for $133,000. <br />Water Production is expending $109,000 for rehabilitation on the North and South Wells and an <br />additional $135,000 for the remodel of the South and North Water Treatment buildings. <br />Water and Sewer Capital Improvement Fund <br />The Water and Sewer Capital Improvement Fund captures impact fees from water and sewer <br />connections from new development. Amounts related to the Triplet Lake Signature Street project of <br />$406,600 have been proposed for FY 2012. <br />Water and Sewer Alternative Water Supply Fund <br />The Water and Sewer Alternative Water Supply Fund is reserving funds for future investment to share in <br />the development of an alternative water supply. A transfer of $400,000 is proposed for FY 2012. Ending <br />FY 2012 fund balance is projected at $1,200,000. <br />A-10 <br />