My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
21-3231 - Comprehensive Annual Financial Report FY 20
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2021 Resolutions
>
21-3231 - Comprehensive Annual Financial Report FY 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2022 11:40:44 AM
Creation date
3/11/2021 11:45:20 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
3/8/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
this report. This report, together with the accounting and budgeting systems, have been designed to <br />conform to the standards set forth by the Governmental Accounting Standards Board and the American <br />Institute of Certified Public Accountants. Fund structure has also been designed to comply with the legal <br />requirements of the various revenue bond covenants and resolutions. <br />MAJOR INITIATIVES <br />During fiscal year 2020, several significant actions occurred within the City that will have lasting impacts <br />going forward. <br />Advanced Metering Infrastructure Proiect (AMI) - The City of Casselberry operates a Water and Sewer <br />Utility that extends well beyond the City limits and encompasses about fourteen square miles. The <br />meters are read monthly by pedestrian meter readers using touch read "wands" to upload and <br />temporarily store data. There are nearly 20,000 meters in service with most fifteen years old or older. <br />In 2020, planning was completed and a contract awarded for the replacement of all customer meters. <br />Technology will be upgraded to Advanced Metering Infrastructure (AMI). This would allow meter data <br />to be accessed digitally through a network. Billing would be more efficient and customer service will <br />have near "real time" access to customer data so alarms can bring timely attention to anomalies and <br />customer inquiries can be efficiently answered. This project will be completed in 2021 and is expected <br />to cost about $9,000,000. <br />Public Works Complex — The City of Casselberry will completely refurbish the Public Works facility on <br />Seventh Street. These facilities share space to house those divisions that generally do field work <br />throughout Casselberry. They include maintenance teams that serve Parks, Streets, Lakes, <br />Stormwater, Trees, Fleet, Water and Sewer Lift Stations and Distribution and Collection. Also located <br />there are the fuel depot and Inventory Control. This is a major renovation that may eventually exceed <br />$15,000,000 in projected cost. Design and Engineering was completed in 2020 and construction will <br />be awarded in 2021. <br />Park Improvement Initiative — Following years of community outreach and master planning, the City of <br />Casselberry asked the voters if they would support major improvements to five parks and the <br />construction of a new one. On March 17, 2020 a referendum was passed overwhelmingly. It was <br />approved for the City of Casselberry to issue bonds to raise up to $24,000,000 for Park Improvements. <br />Planning and Engineering began in 2020 for Secret Lake Park. The first bond issue is planned to be <br />$6,000,000 in 2021. Work will then commence and extend several years. <br />Concord Drive Improvements — Concord Drive is a road on the southwest end of the City that runs <br />between Anchor Road and US Hwy. 17-92. Planning and Engineering was completed in 2020 to make <br />complete street design changes with new sidewalks, raised curves and gutters, landscaping, decorative <br />streetlights and park -like amenities around newly created retention areas. Stormwater infrastructure <br />will be added, and utility infrastructure will be improved. Construction was awarded in 2020 and will <br />continue into 2021. The total cost of this project will be about $2,000,000. <br />DEBTISSUES <br />The City's new debt issues in FY 2020 pertained to debt issuances for capital leases and the Advanced <br />Metering Infrastructure Project (AMI) which was issued in December 2019. The City issued new debt <br />through J P Morgan Chase Bank, N.A. for the replacement or retrofitting of all the water meters within the <br />City's water/sewer system and for upgrading the infrastructure to enable remote reading and other system <br />upgrades in the amount of $8,000,000 for a period of fifteen years. Principal and interest payments are <br />secured by a lien upon, and a pledge of, the net revenues derived from the operation of the water and <br />sewer utility system. The City also financed the purchase of a street sweeper, clam truck, various other <br />trucks, a valve maintenance trailer, golf course lighting and police vehicles, all fully equipped, through a <br />capital lease agreement with SunTrust Equipment Finance & Leasing Corporation. In addition, the City <br />financed a fleet of golf carts through PNC Equipment Financing, LLC. The total increase in lease debt for <br />FY20 was $1,051,050 and is financed over three to five years. <br />
The URL can be used to link to this page
Your browser does not support the video tag.