Laserfiche WebLink
EXHIBIT A <br />DESCRIPTION OF SERIES 2020 PROJECT <br />The Series 2020 Project will consist of the phased demolition and complete renovation of <br />the existing 6.8-acre Public Works Facility to include an Administration Operations/Maintenance <br />Building (31,313 sq. ft.), an Inventory/Fleet Maintenance Building (15,363 sq. ft.) and covered <br />equipment parking (3,781 sq. ft.). The site will be developed to include new paved parking areas <br />and driveways, including a Chemical Storage Building (471 sq. ft.), dumpster enclosure, <br />perimeter fence with sliding gate and all necessary site and building utilities and infrastructure. <br />The Series 2020 Project also includes the replacement of the existing radio antenna and re- <br />locating the existing 11,000 gallon above-ground fuel tank and pumps. <br />A-1 <br />