Laserfiche WebLink
ARTICLE 9 - QUALITY CONTROL <br />9.01 GENERAL 1 <br />9.02 INSPECTIONS AND TESTS 1 <br />ARTICLE 10 - GRASSING AND MULCHING <br />10.01 <br />GENERAL 1 <br />10.02 <br />MATERIALS. 1 <br />10.03 <br />CONSTRUCTION METHODS 1 <br />10.04 <br />SODDING. 1 <br />10.05 <br />CLEAN-UP 1 <br />-------------------------------------------------------------------------------------------------------------------------------- <br />10.06 <br />WATERING 1 <br />ARTICLE 11 - CHAIN LINK FENCE <br />11.01 GENERAL 1 <br />11.02 MATERIALS. 1 <br />11.03 INSTALLATION 4 <br />11.04 ELECTRICAL GROUNDS 5 <br />ARTICLE 12 - ROAD REPLACEMENT FOR UTILITY INSTALLATIONS <br />12.01 <br />UTILITY WORK WITHIN THE ROAD ROW AND EASEMENTS <br />1 <br />12.02 <br />SUBBASE. <br />10 <br />12.03 <br />BASE MATERIAL <br />11 <br />12.04 <br />PRIME AND TACK COATS FOR BASE COURSES <br />16 <br />12.05 <br />ASPHALTIC CONCRETE SURFACE COURSE <br />18 <br />12.06 <br />UNDERDRAINS. <br />21 <br />12.07 <br />CURB, CURB AND GUTTER, SIDEWALKS, DRIVEWAYS, ETC ------------------------------- <br />24 <br />12.08 <br />PAVEMENT MARKINGS <br />26 <br />ARTICLE 13 - UTILITY LINE INSTALLATION REQUIREMENTS <br />13.01 <br />GENERAL REQUIREMENTS--------------------------------------------------------------------------------------1 <br />13.02 <br />OPEN CUT INSTALLATION <br />3 <br />13.03 <br />HORIZONTAL DIRECTION DRILL INSTALLATION <br />10 <br />13.04 <br />JACK AND BORE INSTALLATION--------------------------------------------------------------------------------- <br />19 <br />13.05 <br />PIPE BURSTING INSTALLATION, <br />22 <br />13.06 <br />PRESSURE PIPE RESTRAINT <br />45 <br />13.07 <br />PRESSURE WET TAP CONNECTION <br />47 <br />13.08 <br />LINE STOP INSTALLATION <br />48 <br />MARCH 2019 <br />um <br />TABLE of CONTENTS <br />