Laserfiche WebLink
Statement of Work <br />Please note that any narrative below should be considered in addition to the original Statement of Work, as well as any prior <br />amendments. <br />Purpose <br />The purpose of this amendment is to increase the technical assistance rate from 10% of eligible construction cost to 12% <br />of eligible construction cost and increase funding by $74,074.89 construction cost. This will equate to an increase of <br />$55,556.17 FA and $27,446.31 TA. <br />All other terms and conditions of the amended agreement remain unchanged and in full force and effect <br />Objectives <br />The design and installation of EWP measures as detailed in the individual Damage Survey Report (DSR) and described <br />here: <br />DSR No. IRMA-CAS-001 - Stabilize Howell Creek banks <br />DSR No. IRMA-CAS-002 - Stabilize Gee Creek banks <br />Total Estimated Construction Cost = $1,001,940.89 (increase of $74,074.89) <br />Budget Narrative <br />A. The estimated costs for the Project: <br />1. Total Estimated Project Budget: $1,122,173.80 (increase of $101,521.20) <br />The budget includes: <br />Financial Assistance (FA) Costs: <br />Construction Costs (75% NRCS $751,455.67 (increase of $55,556.17) + 25% Sponsor $250,485.22 (increase of <br />$18,518.72)): $1,001,940.89 (increase of $74,074.89) <br />Technical Assistance (TA) Costs: <br />100% NRCS (12.0% (increase of 2.0%) of total construction cost): $120,232.91 (increase of $27,446.31) <br />2. NRCS pays up to 75 percent of eligible construction costs, and Sponsor pays 25 percent of construction costs. NRCS <br />will contribute up to 12.0 percent of the total construction cost for design services, contract administration and <br />construction management costs. It is possible that technical and administrative costs will exceed this amount, requiring <br />the Sponsor to contribute resources to complete technical and administrative work. <br />3. NRCS funding for this project is provided to the Sponsor in two separate NRCS funding accounts, one for financial <br />assistance (FA) and one for technical assistance (TA). FA costs are associated with construction activities; TA costs are <br />associated with services. These expenditures shall be accounted for separately in order for expenses to be eligible for <br />reimbursement. <br />4. NRCS will provide FA for actual costs as reimbursement to the Sponsor for approved on -the -ground construction <br />costs, subject to above limits. If costs are reduced, reimbursement will be reduced accordingly. Construction costs are <br />associated with the installation of the project measures including labor, equipment and materials. <br />5. NRCS will provide TA reimbursement to the Sponsor for technical and administrative costs directly charged to the <br />project, subject to the above limits. If costs are reduced, reimbursement will be reduced accordingly. These costs <br />include <br />a. engineering costs include, but not limited to, developing a project design that includes construction drawings and <br />specifications, an operation and maintenance plan, a quality assurance/inspection plan and an engineer's estimate of the <br />project installation costs in addition to providing necessary quality assurance during construction. <br />b. contract administration costs include, but not limited to, soliciting, evaluating, awarding and administering contracts for <br />construction and engineering services, including project management, verifying invoices and record keeping. <br />