Laserfiche WebLink
I b. I-or in-kind construction services (materials, labor, and/or equipment supplied y the Sponsor), develop a Plan o <br />Operations describing the construction services to be performed including estimated quantities and values. The Plan of <br />Operations shall be concurred in by NRCS at the pre-design conference. In-kind construction services for equipment <br />shall not exceed published FEMA equipment rates unless otherwise documented and concurred in advance by NRCS. <br />16. The following documentation is required to support the Sponsor's request for reimbursement of in-kind construction <br />services: <br />a. Invoices covering actual costs of materials used in constructing the eligible EWP project measures. <br />b. Records documenting the type, quality, and quantities of materials actually used in constructing the eligible EWP <br />project measures. <br />c. Daily time records for each employee showing name, classification, wage rate, hours, and dates actually employed for <br />constructing the eligible EWP project measures. <br />d. Equipment operating records showing the type and size of equipment, hourly rate, actual hours of operation and dates <br />used to install the eligible EWP project measures. Equipment idle time is not eligible in-kind construction services, even <br />if on the job site, and should not be included in the equipment operating records. <br />17. Within thirty (30) calendar days of signing the project agreement, hold a pre-design conference with the Sponsor, <br />Sponsor's design engineer, and NRCS. The design conference shall set forth design parameters concurred by both the <br />Sponsor and NRCS. During the pre-design conference, NRCS will determine the eligible construction costs. <br />18. Within fourteen (14) calendar days of the pre-design conference submit to NRCS a schedule with time lines of major <br />items to be completed. Milestones shall include, but not limited to, obtaining land rights, obtaining permits, completing <br />any necessary surveys, completing draft engineering plans and specifications for NRCS review, completing final <br />engineering plans and specifications, completing quality assurance plan, solicit bids, award contract, issue notice to <br />proceed, and complete construction. <br />19. Prior to commencement of work and/or solicitation of bids, submit for NRCS review, the preliminary design, <br />construction specifications, and engineering drawings prepared in accordance with standard engineering principles and <br />design parameters set forth in the pre-design conference. <br />20. Upon receiving comments from NRCS, prepare the final design, construction specifications, and engineering <br />drawings in accordance with standard engineering principles that comply with NRCS programmatic principles and design <br />parameters set forth in the pre-design conference. One set of the final plans and specifications shall be submitted to <br />NRCS for final review and concurrence prior to solicitation of bids and/or commencement of work. The final construction <br />plans and specifications shall be signed and sealed by a licensed Professional Engineer registered in the State of Florida <br />(Not required for debris removal only sites). A copy of the signed and seal plans and specifications shall be provided to <br />NRCS. <br />21. Prior to commencement of work and/or solicitation of bids, submit for NRCS review and concurrence a Quality <br />Assurance Plan (QAP). The QAP shall outline technical and administrative expertise required to ensure the EWP project <br />measures are installed in accordance with the plans and specifications, identify individuals with the expertise, describe <br />items to be inspected, list equipment required for inspection, outline the frequency and timing of inspection (continuous <br />or periodic), outline inspection procedures, and record keeping requirements. A copy of the final QAP shall be provided <br />to NRCS prior to commencement of construction. <br />22. Provide construction inspection in accordance with the QAP. <br />23. Prepare and submit for NRCS concurrence an Operation and Maintenance (O&M) Plan, if applicable (Not required <br />for debris removal only sites) , prior to commence of work. The O&M Plan shall describe the activities the Sponsor will <br />do to ensure the project performs as designed. Upon completion of the project measures, the Sponsor shall assume <br />responsibility for O&M. <br />24. Provide copies of site maps to appropriate Federal and State agencies for environmental review. Sponsor will notify <br />NRCS of environmental clearance, modification of construction plans, or any unresolved concerns as well as copies of <br />all permits, licenses, and other documents required by Federal, state, and local statutes and ordinances prior to <br />solicitation for installation of the EWP project measures. All modifications to the plans and specifications shall be <br />reviewed and concurred on by NRCS. <br />25. Ensure that any special requirements for compliance with environmental and/or cultural resource laws are <br />incorporated into the project. <br />26. The Sponsor must secure at its own expense all Federal, State, and local permits and licenses necessary for <br />completion of the work described in this agreement as well as any necessary natural resource rights and provide copies <br />of all permits and licenses obtained to NRCS. <br />Pana .r, of 14 <br />