My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 08/14/2017 Minutes (Workshop)
Laserfiche
>
City Clerk's Public Records
>
Minutes
>
City Commission Minutes
>
City Commission Minutes Archives
>
2017 City Commission Minutes
>
CC 08/14/2017 Minutes (Workshop)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 12:18:39 PM
Creation date
3/14/2018 12:18:36 PM
Metadata
Fields
Template:
City Clerk
Meeting Type
Workshop
City Clerk - Doc Type
Minutes
City Clerk - Date
8/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CASSELBERRY CITY COMMISSION <br />Minutes of August 14, 2017 — workshop <br />Page 2 of 3 <br />Presentation: Deputy Public Works Director/City Engineer Kelly Brock introduced Mr. Paul Yeargain of <br />VHB, the design consultant for all three of the projects which were the subject of the workshop. He advised <br />that all three projects were relatively small projects and were all included in the City's Multimodal <br />Transportation Master Plan (MTMP) adopted in 2016, and had also been through the MetroPlan Orlando <br />prioritization process. He then gave a presentation on the three projects which included the following <br />components: <br />Project Background <br />U Queens Mirror Circle Pedestrian Safety Improvements <br />• Anticipated Schedule <br />• Project Location <br />• Project Limits <br />• Project Objectives <br />• Draft Plan <br />• Additional Staff Recommendations <br />• Summary of Public Input <br />• Discussion <br />U Quail Pond Circle Complete Street/Pedestrian Connectivity Improvements <br />• Anticipated Schedule <br />• Project Location <br />• Project Context <br />• Project Limits <br />• Project Objectives <br />• Draft Plan <br />• Additional Staff Recommendations <br />• Summary of Public Input <br />• Discussion <br />Southcot Drive Bicycle/Pedestrian Improvements <br />• Anticipated Schedule <br />• Project Location <br />• Project Context <br />• Project Limits <br />• Project Objectives <br />• Draft Plan <br />• Additional Staff Recommendations <br />• Summary of Public Input <br />• Discussion <br />Questions & Discussion <br />Discussion: Discussion ensued after each project overview which included issues such as: brick vs. concrete <br />vs. asphalt for crosswalks; impact of the flashing of speed feedback signs and effectiveness of the signs; <br />impact, cost, maintenance and safety issues related to bricked intersections; and traffic congestion in the school <br />zone areas. The Commission reached a consensus on the guidance requested by staff on each ofthe projects as <br />follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.