My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
16-2912 B Addendum 1 to Supplement Agreement 46 with CPH Engineers for Design of Dommerich Hills Pipe Bursting Project
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2016 Resolutions
>
16-2912 B Addendum 1 to Supplement Agreement 46 with CPH Engineers for Design of Dommerich Hills Pipe Bursting Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2017 10:00:20 AM
Creation date
5/15/2017 8:51:39 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
10/10/2016
Doc Number
16-2912
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLUTION 16-2912-B <br />A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF <br />CASSELBERRY, FLORIDA, APPROVING AND AUTHORIZING <br />ADDENDUM NO. 1 TO SUPPLEMENTAL AGREEMENT NO. 46 TO THE <br />STANDARD CONSULTANT AGREEMENT WITH CPH ENGINEERS, <br />INC. FOR CONSTRUCTION AND INSPECTION SERVICES FOR THE <br />DOMMERICH HILLS PIPE BURSTING PROJECT; PROVIDING FOR <br />CONFLICTS, SEVERABILITY, AND EFFECTIVE DATE. <br />WHEREAS, in August of 2016, Phase 1 of the Dommerich Hills Pipe Bursting project <br />was completed, which replaced about 2.5 miles of existing water lines that had reached its life <br />expectancy; and <br />WHEREAS, Phase 2 of this project was budgeted in FY 2017 which consists of replacing <br />approximately 2.8 miles of additional water lines; and <br />WHEREAS, CPH Engineers, Inc. (CPH) is a continuing engineering consultant with the <br />City and was awarded Supplemental Agreement No. 46 for construction engineering and inspection <br />services for the Dommerich Hills Pipe Bursting Project on January 12, 2015; and <br />WHEREAS, professional construction engineering and inspection services will also be <br />needed for Phase 2 of the Dommerich Hills Pipe Bursting Project; and <br />WHEREAS, Public Works staff requested and obtained a cost proposal for Addendum <br />No. 1 to Supplemental Agreement No. 46 for an amount not to exceed $138,726.50 without prior <br />authorization, to perform construction engineering and inspection services for Phase 2 of the <br />Dommerich Hills Pipe Bursting Project; and <br />WHEREAS, Public Works staff has reviewed Addendum No. 1 to Supplemental <br />Agreement No. 46 and finds it favorable to meets the needs of the City. <br />NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE <br />CITY OF CASSELBERRY, FLORIDA, AS FOLLOWS: <br />SECTION I. The City Commission of the City of Casselber7y hereby approves Addendum <br />No. 1 to Supplemental Agreement No. 46 with CPH Engineers, Inc. for the not -to -exceed amount <br />of $139,281.50 and authorizes the Mayor to execute said document on behalf of the City. <br />SECTION II. Conflicts. All Resolutions or parts of Resolutions in conflict with any of the <br />provisions of this Resolution are hereby repealed. <br />SECTION III. Severability. If any Section or portion of a Section of this Resolution <br />proves to be invalid, unlawful, or unconstitutional, it shall not be held to invalidate or impair the <br />validity, force, or effect of any other Section or part of this Resolution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.