Laserfiche WebLink
RESOLUTION 15 -2776 <br />A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF <br />CASSELBERRY, FLORIDA, APPROVING AND AUTHORIZING THE <br />EXECUTION OF CHANGE ORDER NO. 1 TO THE AGREEMENT WITH <br />AJC CONSTRUCTION, LLC FOR THE SOUTH TRIPLET LAKE DRIVE <br />PROJECT; PROVIDING FOR CONFLICTS, SEVERABILITY, AND <br />EFFECTIVE DATE. <br />WHEREAS, via Resolution 14 -2677, the City Commission awarded a construction contract <br />to AJC Construction, LLC in the total bid amount of $1,055,174 for the improvements associated with <br />the South Triplet Lake Drive project; and <br />WHEREAS, via Resolution 14 -2677, The City Commission approved a 10% contingency <br />for the project in the amount of $105,517; and <br />WHEREAS, Change Order No. 1 in the amount of $69,110.31 does not exceed the <br />project's total overall 10% contingency of $105,515; and <br />WHEREAS, the additional amount for the utility portion of the project specifically <br />exceeds the 10% contingency by $6,053.07 which requires City Commission approval; and <br />WHEREAS, field conditions not fully anticipated in the original plans for the project have <br />warranted changes to the scope of the project, including (1) an additional sanitary sewer manhole (2) <br />addition of main line reuse bends, (3) addition of reuse service laterals, (4) lowering of existing water <br />service laterals, (5) additional removal of organic soils, (6) removal of installed storm pipe, and (7) <br />reduction in the size of the residential dock and change in the structural components of the dock; and <br />WHEREAS, the net additional cost of $69,110.31 associated with Change Order No. 1 <br />adjusts the total contractual cost to $1,124,284.31; and <br />WHEREAS, CDM -Smith provides Construction /Engineering/Inspection (CEI) professional <br />services to the City for the South Triplet Lake Drive Project; and <br />WHEREAS, CDM -Smith has reviewed Change Order No. 1 costs with AJC Construction, <br />LLC regarding the changes in scope of the project and finds it acceptable; and <br />WHEREAS, City Staff has reviewed Change Order No. 1 costs from AJC Construction, LLC <br />and finds it adequate to meet the project requirements of the City. <br />NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE <br />CITY OF CASSELBERRY, FLORIDA, AS FOLLOWS: <br />SECTION I. The City Commission of the City of Casselberry hereby approves Change Order <br />No. 1 between the City of Casselberry and AJC Construction, LLC, in the amount of $69,110.31, and <br />