My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CRA 08/15/2013 Minutes
Laserfiche
>
City Clerk's Public Records
>
Minutes
>
Advisory Board Minutes
>
Community Redevelopment Agency Minutes
>
CRA Minutes Archives
>
2013 CRA Minutes
>
CRA 08/15/2013 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2014 3:10:49 PM
Creation date
3/10/2014 3:10:26 PM
Metadata
Fields
Template:
City Clerk
Meeting Type
Regular
City Clerk - Doc Type
Minutes
City Clerk - Date
8/15/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TO: <br />Kyle Dudgeon, City of Casselberry <br />FROM: <br />Phil Gonot, PMG Associates, Inc. <br />SUBJECT: <br />Initiation of Community Redevelopment Plan Amendment Study <br />Overall Strategy . <br />The analysis of the need for an extension of the Redevelopment Plan and life of the CRA should be based on <br />several specific items, including: <br />1. Projects that are needed in the district <br />2. The ability to pay for these projects on a "pay as you go" basis <br />3. Identification of the lost valuation due to the flyover <br />4. Impacts of the flyover on economic growth <br />5. General economic conditions due to the recent recession and deterioration of the Real Estate industry <br />6. Success of the CRA's incentive programs and assistance to businesses <br />7. New Redevelopment Plan focusing on an extension of between 2 and 10 years <br />The basic concept is to request an extension of the CRA time frame to include the completion of the flyover <br />and stabilization of the area after construction. The stabilization will include factors such as the opening of <br />the roadway, determination of any surplus land and the use of this land.. <br />Public Meeting Schedule: <br />The desire of PMG Associates, Inc. (PMGA) is to engage the public as much as possible in this process. <br />This concept also coincides with the CRA's and the City's wishes regarding public input. To achieve this <br />goal, we suggest that a workshop be held with the CRA Board and that the workshop be scheduled for the <br />September 12, 2013 regular meeting. <br />Our approach also includes stakeholder input from selected business and community leaders which will <br />include the Economic Development Advisory Board at their regularly scheduled meeting of August 20, <br />2013. Other interviews will be scheduled as appropriate. <br />Regular meetings will be conducted with staff regarding the progress. Upon completion of the report, a <br />strategy meeting that includes the City Manager, as well as staff, will be held to finalize the approach of <br />addressing the County Commission. <br />3880 NW 2 Cottit # Deerfi ckl i3eadi, Florida 33442 # (954) 427 -5010 Fax (954) 480-8836 # w\ k,�N,.piiiadm(wiates.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.