Laserfiche WebLink
AGREEMENT <br />1. THIS AGREEMENT, made as of the . t_day of <br />iRl 44 2011, by and between the City of Casselberry, Florida, <br />hereinafter called the Owner and Central Florida Environmental Corporation, <br />hereinafter called the Contractor. <br />WITNESSETH, that the Owner and the Contractor, for the considerations stated herein <br />agree as follows: <br />2. SCOPE OF WORK <br />The Contractor shall provide and furnish all of the necessary labor, supervision, material, <br />tools, expendable and permanent equipment , and all utility and transportation services required <br />to perform and complete in workmanlike manner, all of the work, described as: "WIRZ TRAIL, <br />SECTION ONE PROJECT" for the City of Casselberry, Florida. <br />All work shall be performed in strict accordance with the Drawings & Specifications <br />prepared by the City of Casselberry Engineering Division, hereinafter called Engineer, and strict <br />compliance with the Contractor's Bid as accepted, including any amendments agreed upon at the <br />time of execution of this Agreement, and with the other Contract Documents herein mentioned <br />which are parts of this Agreement. <br />3. THE CONTRACT PRICE <br />The Owner shall pay the Contractor, and the Contractor shall accept, in full payment for the <br />performance of this Agreement, subject to any additions or deductions provided for hereby, <br />based upon unit prices and lump sum prices provided in the bid attached hereto, in current funds, <br />the Total Aggregate Amount shall not exceed the sum of. One Million Three Hundred Forty <br />Six Thousand Six Hundred and Seventy Seven Dollars and Forty Nine Cents <br />($1,346,677.49) as lump sum contract. <br />Payments are to be made to the Contractor in accordance with and subject to the provision <br />embodied in the other documents, which are a part of this Agreement. <br />4. CONTRACT TIME AND LIQUIDATED DAMAGES <br />Work under this Agreement shall be commenced with thirty (30) days after issuance of <br />written Notice to Proceed and shall be completed within two hundred and seventy (270) <br />calendar days from commencement of construction date to Substantial Completion from the <br />