My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-2244 Amendment to Contract P09-06 with Horizon Engineering Group, Inc. - Wirz Trail Section 1 Project
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2011 Resolutions
>
11-2244 Amendment to Contract P09-06 with Horizon Engineering Group, Inc. - Wirz Trail Section 1 Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2013 4:49:32 PM
Creation date
8/6/2013 4:19:18 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
4/25/2011
Doc Number
11-2244
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WA---.-V-OORiZON <br />engineering group, inc. <br />April 19, 2011 <br />Luis Cruz <br />Parks and Facilities Manager <br />City of Casselberry <br />95 Triplet Lake Drive <br />Casselberry, FL 32707 <br />Horizon Engineering Group, Inc. <br />2500 Maitland Center Parkway, Suite 300 <br />Maitland, Florida 32751 <br />407.644.7755 Ph <br />407.644.7855 Fax <br />Re: Amendment to Contract P09 -06 — Wirz Trail — Section 1, Post Design Services <br />Mr. Cruz, <br />Horizon appreciates the opportunity to provide Post Design Services for Wirz Trail, Section 1. <br />The activities anticipated include: <br />- Shop Drawing Reviews <br />- Respond to Contractor RFI's <br />- Field Reviews <br />- Meetings <br />- Coordination with Contractor / CEI / City personnel <br />The not -to- exceed fee for the above described services is $4,992.51. <br />We look forward to seeing this project completed and if you need additional information please <br />let me know. <br />Approved By: <br />Charlene Glancy <br />Mayor, City of Casselberry <br />Date <br />X: \3010209_WPT \WPT\11. Project Management \11.19 Supplemental Agreements & Time Extensions \SA_3 \SA_3_HEG_Post_Design.doc <br />Horizon Engineering Group <br />
The URL can be used to link to this page
Your browser does not support the video tag.