Laserfiche WebLink
ATTACH M ENT 'A' <br />PROJECT NO. 1003 <br />SECTION 00500 <br />AGREEMENT <br />1. THIS AGREEMENT, made as of the ay of J r , 2011, by and between the <br />City of Casselberry, Florida, hereinafter called the Owner and Central Flori ' a Environmental Corporation , <br />hereinafter called the Contractor, <br />WITNESSETH, that the Owner and the Contractor, for the considerations stated herein, agree as follows: <br />2. SCOPE OF WORK <br />The Work generally consists of furnishing labor, materials, equipment, mobilization and maintenance of traffic <br />for the resurfacing of 2.50 miles (13,000 linear ft) of Winter Park Drive between Red Bug Lake Road and <br />Seminola Boulevard and 0.65 miles (3,426 linear ft) of reconstruction of Winter park Drive between Seminola <br />Boulevard and 7th Street. <br />All work shall be performed in strict accordance with the Drawings & Specifications prepared by the City of <br />Casselberry Engineering Division, hereinafter called the Engineer, and in strict compliance with the <br />Contractor's Proposal as accepted, including any amendments agreed upon at the time of execution of this <br />Agreement, and with the other Contract Documents herein mentioned which are a part of this Agreement. <br />3. THE CONTRACT PRICE <br />The Owner shall pay to the Contractor, and the Contractor shall accept, in full payment for the performance of <br />this Agreement, subject to any additions or deductions provided for hereby, based upon unit prices provided <br />in the proposal attached hereto, in current funds, the Total Aggregate Amount shall not exceed the sum of: <br />Two million two hundred fifty thousand seven hundred forty nine and 97/100 dollars_ ($ 2.250,749.97) as <br />unit price contract. <br />Payments are to be made to the Contractor in accordance with and subject to the provisions embodied in the <br />other documents, which are a part of this Agreement. <br />4. CONTRACT TIME AND LIQUIDATED DAMAGES <br />Work under this Agreement shall be commenced within thirty (30) days after issuance of written Notice to <br />Proceed, and shall be completed within four hundred (400) calendar days from commencement of <br />construction date to substantial completion plus fifteen (15) calendar days to Final Completion. Liquidated <br />damages due to the Owner shall be calculated in accordance with FDOT Specifications Section 8 -10 <br />Liquidated Damages for Failure to Complete the Work. <br />5. AUTHORITY AND RESPONSIBILITY OF THE OWNER <br />All Work shall be done under the general supervision of the Owner. The Owner shall decide any and all <br />questions which may arise as to the quality and acceptability of materials furnished, work performed, rate of <br />progress of work, interpretation of Specifications, and all questions as to the acceptable fulfillment of the <br />Agreement on the part of the Contractor. These provisions shall not release the Contractor from any <br />Contractor responsibility contained herein. <br />00500-1 <br />City of Casse /berry <br />Version 8100 <br />