My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-2221 Authorizing Execution of Change Order #2 - Killebrew, Inc.
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2011 Resolutions
>
11-2221 Authorizing Execution of Change Order #2 - Killebrew, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2013 10:47:04 AM
Creation date
8/6/2013 10:46:40 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
1/24/2011
Doc Number
11-2221
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
18 <br />1" <br />Dbl Long Water Service on 6" Main <br />17 <br />EA <br />$ <br />970.00 <br />$ <br />16,490.00 <br />19 <br />1" <br />Dbl Short Water Service on 8" Main <br />5 <br />EA <br />$ <br />705.00 <br />$ <br />3,525.00 <br />20 <br />1" <br />Dbl Long Water Service on 8" Main <br />8 <br />EA <br />$ <br />995.00 <br />$ <br />7,960.00 <br />21 <br />1" <br />Dbl Short Water Service on 12" Main <br />19 <br />EA <br />$ <br />765.00 <br />$ <br />14,535.00 <br />22 <br />1" <br />Dbl Long Water Service on 12" Main <br />15 <br />EA <br />$ <br />11050.00 <br />$ <br />15,750.00 <br />23 <br />Dual Check Valve on all Service Lines <br />81 <br />EA <br />$ <br />250.00 <br />$ <br />20,250.00 <br />Estimated <br />Construction Cost for Option 3 <br />6" Gate Valve Assembly <br />15 <br />EA <br />$ 1,125.00 <br />$ <br />512,864.60 <br />Project No. 25 <br />Proiect Name: Sunset Drive <br />Item No. <br />IDescription <br />Quantit <br />Unit <br />Unit Price <br />Total <br />1 <br />Mobilization, Demobilization <br />1 <br />EA <br />$ 18,400.00 <br />$ 18,400.00 <br />2 <br />Pre - Construction Video <br />1 <br />EA <br />$ 3,000.00 <br />$ 3,000.00 <br />3 <br />Maintenance of Traffic <br />1 <br />EA <br />$ 11,900.00 <br />$ 11,900.00 <br />4 <br />6" HDPE DR11 <br />2,224 <br />LF <br />$ 28.30 <br />$ 62,939.20 <br />5 <br />8" HDPE DR11 <br />117 <br />LF <br />$ 32.10 <br />$ 3,755.70 <br />6 <br />10" HDPE DR11 <br />2,586 <br />LF <br />$ 41.65 <br />$ 107,706.90 <br />7 <br />Fire Hydrant on 6" Main <br />2 <br />EA <br />$ 800.00 <br />$ 1,600.00 <br />8 <br />Fire Hydrant on 10" Main <br />4 <br />EA <br />$ 950.00 <br />$ 3,800.00 <br />10 <br />6" Gate Valve Assembly <br />15 <br />EA <br />$ 1,125.00 <br />$ 16,875.00 <br />11 <br />8" Gate Valve Assembly <br />1 <br />EA <br />$ 1,240.00 <br />$ 1,240.00 <br />12 <br />10" Gate Valve Assembly <br />1 <br />EA <br />$ 1,600.00 <br />$ 1,600.00 <br />13 <br />6" Connection to 2" Water Main <br />5 <br />EA <br />$ 500.00 <br />$ 2,500.00 <br />14 <br />6" Connection to 6" Water Main <br />5 <br />EA <br />$ 1,285.00 <br />$ 6,425.00 <br />15 <br />8" Connection to 6" Water Main <br />7 <br />EA <br />$ 2,000.00 <br />$ 14,000.00 <br />16 <br />8" Connection to 8" Water Main <br />4 <br />EA <br />$ 1,430.00 <br />$ 5,720.00 <br />21 <br />1" Dbl Short Water Service on 6" Main <br />4 <br />EA <br />$ 675.00 <br />$ 2,700.00 <br />22 <br />1" Dbl Long Water Service on 6" Main <br />7 <br />EA <br />$ 970.00 <br />$ 6,790.00 <br />23 <br />1" Dbl Short Water Service on 10" Main <br />4 <br />EA <br />$ 750.00 <br />$ 3,000.00 <br />24 <br />Dual Check Valve on all Service Lines <br />15 <br />EA <br />$ 250.00 <br />$ 3,750.00 <br />Estimated <br />Construction Cost for Option 3 <br />$ 277,701.80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.